Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Question #2 (40 Points): Show detailed calculations AND the required formulas DO Not show excel calculations An engineer is trying to decide which process to
Question #2 (40 Points): Show detailed calculations AND the required formulas DO Not show excel calculations An engineer is trying to decide which process to use to increase the efficiency of an oil refinery. Option 1 will cost $203,000 to buy and $85,000 per year to operate. Some components will further be replaced one time per year at a cost of $5500. Option 2 will cost $396,000 to buy and $119,000 per year to operate, but will result in a sludge hauling cost to the monofill of $37,000 per year less than that of Option 1. The useful lives are 3 and 4 years for Options 1 and 2, respectively. The salvage values are calculated for each option using the following schedule: Number of years of operation 1 2 3 Salvage Value 40% of Initial cost 30% of Initial cost 20% Initial cost 10% of Initial cost 4 Using an interest rate of 10%, determine the better alternative by: a) Using the PW Analysis with an infinite planning horizon. (16 Points) b) Using the PW Analysis with a 10-year study period. (14 Points) c) Using the AW Analysis considering the useful life of each alternative. Comment on the results. (10 Points) Question #2 (40 Points): Show detailed calculations AND the required formulas DO Not show excel calculations An engineer is trying to decide which process to use to increase the efficiency of an oil refinery. Option 1 will cost $203,000 to buy and $85,000 per year to operate. Some components will further be replaced one time per year at a cost of $5500. Option 2 will cost $396,000 to buy and $119,000 per year to operate, but will result in a sludge hauling cost to the monofill of $37,000 per year less than that of Option 1. The useful lives are 3 and 4 years for Options 1 and 2, respectively. The salvage values are calculated for each option using the following schedule: Number of years of operation 1 2 3 Salvage Value 40% of Initial cost 30% of Initial cost 20% Initial cost 10% of Initial cost 4 Using an interest rate of 10%, determine the better alternative by: a) Using the PW Analysis with an infinite planning horizon. (16 Points) b) Using the PW Analysis with a 10-year study period. (14 Points) c) Using the AW Analysis considering the useful life of each alternative. Comment on the results. (10 Points)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started