Question
QUESTION 2 You are going to set a cement plug to isolate an open hole section during a well P&A operation Hole diameter =
QUESTION 2 You are going to set a cement plug to isolate an open hole section during a well P&A operation Hole diameter = 12.25 in. Casing ID = 12.615 in Casing shoe depth = 9,000 ft Set a balanced plug, 500 ft high, with its bottom at 9,250 ft. Use water spacers of equal height inside DP and in annulus. The required spacer height is 600 ft. Drillpipe string consists of 5" D 19.50 lb/ft (ID = 4.276 in.), open ended. Cement: Use class G cement, 15.8 ppg. Use 50% excess in open hole (adopt an effective hole diameter) Use 10-bbl excess in cased hole Determine: a) Spacer ahead, cement slurry, spacer behind, and displacement mud volumes (bbl)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get StartedRecommended Textbook for
Holt McDougal Larson Geometry
Authors: Ron Larson, Laurie Boswell, Timothy D. Kanold, Lee Stiff
1st Edition
0547315171, 978-0547315171
Students also viewed these Mechanical Engineering questions
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
View Answer in SolutionInn App