Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 25 (2 points) Saved What type of routing protocol are RIP and RIPv2? distance-state protocol link-state protocol hybrid protocol distance-vector protocol O Consider a

image text in transcribed
image text in transcribed
Question 25 (2 points) Saved What type of routing protocol are RIP and RIPv2? distance-state protocol link-state protocol hybrid protocol distance-vector protocol O Consider a process consisting of three resources. Assume there exists unlimited demand for the product, and that all activities are always performed in the following sequence. Resource 1 has a processing time of 6 minutes per unit Resource 2 has a processing time of 3 minutes per unit. Resource 3 has a processing time of 5 minutes per unit, All three resources are staffed by one worker and each worker gets paid $15 per hour. Do not round your intermediate calculations. Round your answer to 2 decimal places a. What is the cost of direct labor? $ 4.50 per unit Do not round your intermediate calculations Round your answer to nearest whole number b. What is the labor content? E 14 minutes per unit Do not round your intermediate calculations Round your answer to 2 decimal places c. What is the average labor utilization? N77 78 percent Do not round your intermediate calculations Round your answer to 2 decimal places d. Assume the demand rate is 19 units per hour What is the fakt time? minutes per unit Do not round your intermediate calculations. Round your answer to 2 decimal places e. Assume the demand rate is 19 units per hour What is the target manpower? employees Do not round your intermediate calculations. Round your answer to 1 decimal place f. If one additional worker could be hired, to which resource should the additional resources be assigned? Calculate the process capacity units per hour Do not round your intermediate calculations. Round your answer to 1 decimal place. . If they could take 1 minute of task time from one resource and give it to another resource (so the labor content remains the same). What would be the new capacity of the process (units per hour)? Assume that there is still only 1 worker per station units per hour Do not round your intermediate calculations. Round your answer to 1 decimal place, What would be the capacity of the process if they integrated the work so that all workers do all three tasks (units per hour)? Assume that there is still only 1 worker per station units per hour

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Databases questions