Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question #3 (7 points) - Use the information from the CAT Performance Handbook to answer the question. A contractor wants to move a loose stockpile

image text in transcribed

Question #3 (7 points) - Use the information from the CAT Performance Handbook to answer the question. A contractor wants to move a loose stockpile of material onsite using an SU blade on a D9T dozer. The material is a clay, and is to be moved a distance of 400 ft, based on a center of mass to center of mass distance. The dozing occurs downhill on a 20% grade. The operator will have average skill and the operator is working is foggy conditions. The operator will be using a slot dozing technique and the material weighs 2,250 lb/LCY. Job efficiency is assumed to be equivalent to a 40-min hour. You are to calculate the direct cost of the proposed earthmoving operation in dollars per bank cubic yards ($/BCY). Assume that the hourly cost for the dozer including the operator is $135/hr. (a) Using the CAT charts on the following pages determine the following: Ideal Maximum Production (LCY/hr from CAT chart): Material-Weight Correction Factor: Operator Correction Factor: Material-Type Correction Fact Operating-Technique Correction Factor: Visibility Correction Factor: Operating Efficiency Factor: Grade Correction Factor: (b) Determine the dozer production rate in bcy per hour, when the load factor of the material is 0.83. (c) Determine the overall production cost of the proposed earthmoving operation based on bcy ($/bank cubic yard). Question #3 (7 points) - Use the information from the CAT Performance Handbook to answer the question. A contractor wants to move a loose stockpile of material onsite using an SU blade on a D9T dozer. The material is a clay, and is to be moved a distance of 400 ft, based on a center of mass to center of mass distance. The dozing occurs downhill on a 20% grade. The operator will have average skill and the operator is working is foggy conditions. The operator will be using a slot dozing technique and the material weighs 2,250 lb/LCY. Job efficiency is assumed to be equivalent to a 40-min hour. You are to calculate the direct cost of the proposed earthmoving operation in dollars per bank cubic yards ($/BCY). Assume that the hourly cost for the dozer including the operator is $135/hr. (a) Using the CAT charts on the following pages determine the following: Ideal Maximum Production (LCY/hr from CAT chart): Material-Weight Correction Factor: Operator Correction Factor: Material-Type Correction Fact Operating-Technique Correction Factor: Visibility Correction Factor: Operating Efficiency Factor: Grade Correction Factor: (b) Determine the dozer production rate in bcy per hour, when the load factor of the material is 0.83. (c) Determine the overall production cost of the proposed earthmoving operation based on bcy ($/bank cubic yard)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Core Concepts of Accounting

Authors: Cecily A. Raiborn

2nd edition

470499478, 978-0470499474

More Books

Students also viewed these Finance questions

Question

13.6 Explain how to set up aflexible benefits program.

Answered: 1 week ago

Question

13.2 Describe five government-mandated benefits.

Answered: 1 week ago