Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 3 (Prof. Fevziye Akz Group) :(30 marks) For an industrial structure, 360-dose concrete will be produced using the materials which their properties are given

image text in transcribed

Question 3 (Prof. Fevziye Akz Group) :(30 marks) For an industrial structure, 360-dose concrete will be produced using the materials which their properties are given in the Table3. Table3. Material B Y (kg/dm) (kg/dm3) A1 A2 A3 Cement 1,60 1,57 1,57 1,15 2.50 2.50 2.56 3,10 a) Calculate the amount of theoretical material quantities required for 1 m3 of fresh concrete with an air gap of 1.5%, using the mix ratios (a1, a2, a3) of the aggregates and the fineness module (FM) of the mixture you set in Question2. b) Calculate the amount of water from the correlation below, W water=30(10-FM) c) Since the desired slump in the 10 liter test mixture is provided with 1.98 It of water and the unit weight of the fresh concrete is 2.325 kg / dm3; Calculate the actual amount of materials required for 1 m3 of fresh concrete. d) According to the test of 15/30 cm sized cylinder samples, concrete is produced on the 28th day, with an average load of 460 kN. The concrete class is C18, C20, C25 or C30 ? Question 3 (Prof. Fevziye Akz Group) :(30 marks) For an industrial structure, 360-dose concrete will be produced using the materials which their properties are given in the Table3. Table3. Material B Y (kg/dm) (kg/dm3) A1 A2 A3 Cement 1,60 1,57 1,57 1,15 2.50 2.50 2.56 3,10 a) Calculate the amount of theoretical material quantities required for 1 m3 of fresh concrete with an air gap of 1.5%, using the mix ratios (a1, a2, a3) of the aggregates and the fineness module (FM) of the mixture you set in Question2. b) Calculate the amount of water from the correlation below, W water=30(10-FM) c) Since the desired slump in the 10 liter test mixture is provided with 1.98 It of water and the unit weight of the fresh concrete is 2.325 kg / dm3; Calculate the actual amount of materials required for 1 m3 of fresh concrete. d) According to the test of 15/30 cm sized cylinder samples, concrete is produced on the 28th day, with an average load of 460 kN. The concrete class is C18, C20, C25 or C30

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Handbook Of Energy Audits

Authors: Albert Thumann, Terry Niehus, William J. Younger

8th Edition

1439821453, 978-1439821459

More Books

Students also viewed these Accounting questions

Question

discuss different sources of numerical data;

Answered: 1 week ago

Question

design and evaluate an effective survey instrument;

Answered: 1 week ago

Question

administer a survey to an appropriate sample of respondents;

Answered: 1 week ago