Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Question 3.1 Relevant costing This question consists of two independent parts (PART A and B) and both must be answered. PART A You are a

image text in transcribed

image text in transcribed

image text in transcribed

Question 3.1 Relevant costing This question consists of two independent parts (PART A and B) and both must be answered. PART A You are a Junior Management Accountant at Mask-it-up (Pty) Ltd, a "Proudly South African" company that manufactures and supplies innovative 3D formed design masks that maximises airflow. The innovative 3D is comfortable to wear and easy for talking. The design prevents the mask from slipping down the face and for those that wear spectacles it prevents misting. Mask-it-up supplies both local and international retailers and its revenue mix is made up of 80% local and 20% foreign customers. As people are encouraged not to use medical-grade masks, especially N95 masks and respirators, which are often reserved for medical use, the innovative 3D has become one of the preferred masks by the general public. The Production Manager, Ms. Clean has approached you for some costing advice on one of the projects called "Project Phila", a once-off order from one of the overseas customers that she intends to tender for. The overseas company wants the 3D masks to be personalised with its company name. Ms Clean presented you with the project costs estimates as follows: R Direct materials - Fabric 60 000 Direct materials - Mask filters 120 000 Direct labour 90 000 Supervision 30 000 Overheads 180 000 Total 480 000 Additional information: 1. Fabric will have to be ordered at the amount shown above. Mask filters are in stock having been purchased at the above price several months ago. There is no other use for the Mask filters and it would cost R26 250 to dispose them off if they are not used on this project. 2. The direct labour cost of R90 000 relates to workers who will be transferred to Project Phila from another project. Replacement labour will have to be recruited for the other project at a cost of R105 000. 3. Supervision costs will be conducted by the existing staff within their normal duties. 4. Overheads consist of both specific and allocated, 45% of overheads represents the allocated portion 5. The project will require the utilisation of a machine which will be purchase at a cost of R150 000, the machine will then be sold at the end of the project for R75000. The overseas supplier has indicated that it is prepared to pay a maximum of R450 000 for Project Phila. Mask-it-up has adopted a strategy to increase its footprint internationally to maximise its revenue. PART B Kako-lako (Pty) Ltd manufactures and sells three different distinct beverages. As part of the standards and budget setting process, the capacities of the product lines have to be considered. The following information is available for the 6 months from May 2021 Fuzz tea Kako-Lako Mjojo - Combucha 30 000 Demand (Units) Contribution per unit 18 000 R4,5 24 000 R6 R3 1 hour 2,4 hours 1,80 hours Required labour hours A maximum of 108 000 direct labour hours is available in normal working hours for the 6 months period. Employees only work during normal hours and the company does not have resources for its employees to work overtime. Process costing information Kako-lako uses a process costing system in the production of three products. Information below relates to the production process of product Fuzz tea, for the month of January 2021. Units 3 000 4 500 Opening Work-in-progress (WIP) - 1 January: 60% complete Closing Work-in-progress( WIP) - 31 January: 65% complete New units put into production in January 2021 Completed and transferred in January 2021 37 000 30 000 Additional information: . Cost information was as follows: R Opening WIP Raw materials Conversion Added in January 2021 Raw materials Conversion 48 000 29 500 106 600 58 963 . Normal losses are estimated at 3% of the inputs that reaches the wastage point. Normal losses occur when the process is 60% complete. Raw materials are added at the beginning of the process and conversion takes place evenly throughout the process. Kako-lako uses the weighted average method of inventory valuation. Marks REQUIRED (a) Using relevant costing principles, calculate a Project cost schedule for Project Phila. You should also provide reasons for inclusion or exclusion of each cost item. (10) (b) Calculate the optimal production mix of Kako-lako (Pty) Ltd's three products for the six-month's period from May 2021. Round to two decimals throughout your calculation. (8) (c) Prepare Kako-lako's budgeted quantity statement for January 2021. (6) TOTAL (24) Question 3.2 Activity-Based Costing Siqalo Bread (Pty) Ltd was started by Ms. Fresh after she got retrenched from a Cake bakery that closed its doors in April 2020 due to negative effects from the hard lockdown as a result of the Covid 19 pandemic. After struggling for the first few months of her business in a very competitive market, Ms. Fresh decided to use two of her grandmother's secret family recipes of corn and multigrain bread. Bread from these two recipes have turned to be loved by many South Africans. Siqalo Bread currently operates in Pretoria North and supplies to a few independent retailers on a cash delivery basis. The company is currently using a traditional costing system. Fixed manufacturing overheads are based on budgeted normal capacity of 150 000 hours per year, of which 67 500 hours are allocated to Corn bread and 82 500 hours to Multigrain bread. Ms. Fresh believes that the traditional costing system may be providing misleading information in the allocation of overheads to the products, as a result, she approached Mr. Mhambi, a Management accountant who has developed an activity-based analysis of the 2021 budgeted fixed manufacturing overheads which are set as below: Expected fixed manufacturing overheads and activities involved: Activity Cost drivers R Set-up costs Set-ups 31 500 Quality control Batches 3 150 Baking Baking hours 15 750 Packaging time Packing hours 6 900 Not identified 13 200 Total 70 500

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials Of Crm

Authors: Bryan Bergeron

1st Edition

0471206032, 978-0471206033

More Books

Students also viewed these Accounting questions