Question 5: [20 marks The activated sludge bioreactor facility of a certain plant is to be expanded. The results of a settling cylinder test of

image text in transcribed

Question 5: [20 marks The activated sludge bioreactor facility of a certain plant is to be expanded. The results of a settling cylinder test of the existing bioreactor suspension are shown in Table 95. The total flow feed to the clarifier (Q+Q:) is 10,000 m/d and the influent MLSS is 3,500 mg/L. The limiting solids flux (SFL) is 2.2 kg/m.h. i) Draw the gravity solids flux curve (SF) using the batch settling data given in Table Q5. [8 marks] ii) Determine the underflow concentration in mg/L. [2 marks] iii) Determine the clarification area required in m. [7 marks] iv)Determine the thickening area required in m. [3 marks] Table Q5 Initial solids concentration 1410 2210 3000 3500 4500 5210 6510 8210 (MLSS) in mg/L Initial interface settling velocity (V/) in m/h 2.93 1.81 1.20 0.79 0.46 0.26 0.12 0.084

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Separation Of Molecules Macromolecules And Particles Principles Phenomena And Processes

Authors: Kamalesh K. Sirkar

1st Edition

0521895731, 9780521895736

More Books

Students also viewed these Chemical Engineering questions

Question

LO28.1 List two ways that economic growth is measured.

Answered: 1 week ago