Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Question 5 When a major highway was to be constructed nearby, a farmer realized that a dry streambed running through his property might be a
Question 5 When a major highway was to be constructed nearby, a farmer realized that a dry streambed running through his property might be a valuable source of sand and gravel. He shipped samples to a testing laboratory and learned that the material met the requirements for certain low-grade fill material The farmer contacted the highway construction contractor, who offered 65cents per cubic meter for 45,000 cubic meters of sand and gravel. The contractor would build a haul road and would use his own equipment. All activity would take place during a single summer The farmer hired an engineering student for $2500 to count the truckloads of material hauled away. The farmer estimated that 2 acres of streambed had been stripped of the sand and gravel. The 640- acre farm had cost him S300 per acre, and the farmer felt the property had not changed in value. He knew that there had been no use for the sand and gravel prior to the construction of the highway, and he could foresee no future use for any of the remaining 50,000 cubic meters of sand and gravel. Determine the farmer's depletion allowance using Percentage Depletion. (Hint: Gross Income 0.65x 45000 29,250 and Taxable Income = 29,250-2500 26,750)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started