Question 5 With the cost approach, there are two types of construction cost estimates: is the cost of same utility and is the cost of

Question 5
With the cost approach, there are two types of construction cost estimates:
is the cost of same utility and
is
the cost of exact physical replica. Assuming both could be estimated, the cost of the second is
generally
the first.