question 9 Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production
question 9
Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.
Production Activity | Indirect Labor | Indirect Materials | Other Overhead | ||||||||
Grinding | $ | 340,000 | |||||||||
Polishing | $ | 145,000 | |||||||||
Product modification | 550,000 | ||||||||||
Providing power | $ | 215,000 | |||||||||
System calibration | 440,000 | ||||||||||
Additional information on the drivers for its production activities follows.
Grinding | 18,000 | machine hours |
Polishing | 18,000 | machine hours |
Product modification | 2,000 | engineering hours |
Providing power | 17,000 | direct labor hours |
System calibration | 1,000 | batches |
Job 3175 | Job 4286 | |||
Number of units | 210 | units | 2,625 | units |
Machine hours | 450 | MH | 4,500 | MH |
Engineering hours | 32 | eng. hours | 28 | eng. hours |
Batches | 10 | batches | 30 | batches |
Direct labor hours | 450 | DLH | 4,050 | DLH |
Required: 1. Classify each activity as unit level, batch level, product level, or facility level.
Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit Job 3175 Job 4286 Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing activities into a single cost pool. Determine overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.) Job 3175 Job 4286 Activity driver Overhead incurred assigned Activity Overhead Cost Activity Drivers Activity Rate Overhead assigned Activity driver incurred Grinding & Polishing Machine hours Product modification Engineering hrs. Providing power Direct labor hrs. System calibration batches Required: 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibrationStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started