Question A Create an audit checklist using the provided scenario as a guide. Show the checklist in a table format. TEN (10) observations from your

Question A Create an audit checklist using the provided scenario as a guide. Show the checklist in a table format. TEN (10) observations from your inspection should be examined.. Propose preventive actions to address the SS 651:2019 Clause (e) of 9.2.2 Internal audit programme, that is "Take action to address nonconformities and continually improve its Safety and Health(S&H) performance." TEN (10) scenario observations identified 1. Safety Data Sheet (SDS) of certain chemicals were either found missing or dated more than 5 years. 2. One of the facility management technicians was performing maintenance on a process equipment and no barricades were installed to prevent any unauthorized access to the work-area. 3. One of the sub-contractors (who was engaged by the facilities management team) was observed to be standing on the top rung of an A-frame ladder with both of his hands on his work and he was not wearing any safety harness. 4. When a worker who performed Work-At-Height was interviewed, he said that he is trained and permitted to work at height. However, his actual work practices were unsafe and risky.

5. Self-contained breathing apparatus (SCBA) and chemical suits for Emergency Response Team (ERT) were faulty. 6. CPR pocket masks in the first aid boxes had expired. Used and opened triangular bandages were found. 7. Several of the lifting equipment (webbing sling, shackle and chain block) were expired and a few of them did not have any lifting tags. 8. Tools and materials were scattered on the floor in the maintenance room. Damaged T5 fluorescent light, metal piping and plastic casing were found in the waste scrap bin. When the facility supervisor was interviewed, he mentioned that scrap materials were consolidated and would be disposed when the waste bins were full. 9. A sample size inspection of the fire protection system revealed that three ABC type of fire extinguishers were not charged with enough pressure and two ABC fire extinguishers were found to be obstructed. Further inspection revealed that four hose reel casings were dented.

10. Liquid stains were found on the floor within the perimeter of the storage tankers where hazardous chemicals were stored.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Successful Project Management

Authors: Jack Gido, Jim Clements

4th Edition

9780324656152, 324656130, 978-0324656138

More Books

Students also viewed these General Management questions