Question

1 Approved Answer

question from data structure coding in java Question 1 MARKS : Your friend is a chief architect, who is working on building a skyscraper, in

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

question from data structure coding in java

Question 1 MARKS : Your friend is a chief architect, who is working on building a skyscraper, in Mumbai. The construction is in such a way that the floors will be constructed in other factories and they will assembled. All the sizes will be distinct. The skyscraper needs to be constructed in N days with the following conditions : a) Every day a floor is constructed in a separate factory of distinct size. b) The floor with the larger size must be placed at the bottom of the building. c) The floor with the smaller size must be placed at the top of the building. Note: A floor cannot be assembled in the building until all floors larger in size are placed. As a friend he wants you to build a small program that will help him analyze the construction process, to avoid manual work and errors. Input First Line: contains the total floors N in the building Second Line onwards: Contains N inputs in which the ith integer denotes the size of the floor that will be given to architect by factories on the ith day. Output You are required to print N lines. Print the size of the floor in descending order, which can be assembled. If no floor can be assembled on the ith day, leave the line empty. Sample Test Cases TestCase 1 enter the total no of floors in the building 3 enter the floor size given on day : 1 enter the total no of floors in the building 3 enter the floor size given on day : 1 3 enter the floor size given on day : 2 1 enter the floor size given on day : 3 2 The order of construction is as follows Day: 1 3 Day: 2 Day: 3 21 Explanation The largest floor size is available on day 1 itself, hence it will be assembled on day 1 . The largest floor size is available on day 1 itself, hence it will be assembled on day 1 . On the second day floor of size 1 is available and cannot be assembled as the floor of size 2 is not available. On the third day floor of size 2 , is available and accordingly, the remaining floor (2,1) will assemble in the order 2,1 TestCase 2 enter the total no of floors in the building 5 enter the floor size given on day : 1 4 enter the floor size given on day : 2 5 enter the floor size given on day : 3 1 enter the floor size given on day : 4 2 enter the floor size given on day : 5 3 The order of construction is as follows Day: 1 Day: 2 54 Day: 3 Day: 4 Day: 5 321 On the first day, the floor of size 4 is given. But it cannot be assembled as the floor of size 5 is still remaining. On the second day, the floor of size 5 is given so now the floor of sizes 5 and 4 can be assembled On the third and fourth days, floors cannot be assembled as the size of 3 needs to be given yet. Therefore, these lines are empty. On the fifth day, all the floors of sizes 3,2 , and 1 can be placed. Test Case 3 enter the total no of floors in the building 10 enter the floor size given on day : 1 1 enter the floor size given on day : 2 2 enter the floor size given on day : 3 3 enter the floor size given on day: 4 enter the floor size given on day : 3 3 enter the floor size given on day : 4 8 enter the floor size given on day : 5 9 enter the floor size given on day : 6 10 enter the floor size given on day: 7 4 enter the floor size given on day : 8 5 enter the floor size given on day : 9 The order of construction is as follows Day: 1 Day: 2 Day: 3 Day: 4 Day: 5 Day: 6 1098 Day: 7 Day: 8 Day: 9 7 Day: 10 654321 Instructions : 1) You can use any inbuilt java function/s to implement the above functionalities 2) You can choose any DataStructure(Stack, Queve, LinkedList) to implement the above functionality

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Visual Basic6 Database Programming

Authors: John W. Fronckowiak, David J. Helda

1st Edition

0764532545, 978-0764532542

More Books

Students also viewed these Databases questions

Question

Show that P{Ta Answered: 1 week ago

Answered: 1 week ago

Question

Write short notes on Interviews.

Answered: 1 week ago