Answered step by step
Verified Expert Solution
Question
1 Approved Answer
questions 1-5 Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only
questions 1-5
Sweeten Company had no jobs in progress at the beginning of the year and no beginning inventories. It started, completed, and sold only two jobs during the year-Job P and Job Q. The company uses a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, it estimated that 4,000 machine-hours would be required for the period's estimated level of production. Sweeten also estimated $33,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $3.70 per machine-hour. Because Sweeten has two manufacturing departments-Molding and Fabrication-It is considering replacing its plantwide overhead rate with departmental rates that would also be based on machine-hours. The company gathered the following additional information to enable calculating departmental overhead rates: Molding Fabrication Total Estimated total machine-hours used 2,500 1,500 4.000 Estimated total fixed manufacturing overhead $ 15,000 $ 18,000 $ 33,000 Estimated variable manufacturing overhead per machine-hour $ 3.40 $ 4.20 The direct materials cost, direct labor cost, and machine-hours used for Jobs P and Q are as follows: Job P $ 33,000 $ 37,000 Job O 5 18,000 $ 15,500 Direct materials Direct labor cost Actunl machine-hours used Molding Pabrication total 3.700 2,600 6.300 2,800 2,900 5,700 Sweeten Company had no overapplied or underapplied manufacturing overhead costs during the year Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions, 9-15, assume that the company uses predetermined departmental overhead rates with machine hours as the allocation base in both departments 1. What is the company's plantwide predetermined overhead rate? (Round your answer to 2 decimal places.) Predetermined overhead rate per MH 2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q? (Do not round intermediate calculations.) Job P Job a Manufacturing overhead applind 3. What is the total manufacturing cost assigned to Job P? (Do not round intermediate calculations, Round your final answer to nearest whole dollar) Total manufacturing cost 4. If Job Pincludes 20 units, what is its unit product cost? (Do not round Intermediate calculations. Round your final answer to nearest whole dollar) Un product call 5. What is the total manufacturing cost assigned to Job Q? (Do not round intermediate calculations.) Total manufacturing out Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started