Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Read the B&L Inc. case below and answer the following questions: Analyze the information and make a recommendation: Should B&L outsource the outrigger bracket? Hint:

Read the B&L Inc. case below and answer the following questions:

  1. Analyze the information and make a recommendation: Should B&L outsource the

    outrigger bracket? Hint: Compare the cost of in-house manufacturing operation against

    the cost of outsourcing based on an EOQ model.

  2. Under the outsourcing option, what is the optimal order quantity? Can you think of a

    more practical ordering approach keeping the end product in mind?

  3. Do the manufacturing cost comparisons (Exhibit 1) make sense to you? What next steps

    would you suggest?

B&L Inc.

Brian Wilson, materials manager at B&L Inc. in Lancaster, Pennsylvania, was considering a proposal from his purchasing agent to outsource manufacturing for an outrigger bracket. It was the end of April and Mr. Wilson had to evaluate the proposal and make a decision regarding whether to proceed.

B&L INC. BACKGROUND

B&L Inc. manufactured trailers for highway transport trucks. The company comprised three divisions: the Trailer, Sandblast & Paint, and Metal Fabricating Divisions. Each division operated as a separate profit center, but manufacturing operations between each were highly integrated. The Metal Fabricating Division produced most of the component parts of the trailers, the Trailer Division performed the assembly operations, and the Sandblast & Paint Division was responsible for completing the sand- blasting and final painting operation. B&L manufactured approximately 40 trailers per year, with about two-thirds produced during the period from November to April.

THE OUTRIGGER BRACKET

The outrigger bracket, part number T-178, was an accessory that could be used to secure oversized containers. The bracket consisted of four component parts welded together, and each trailer sold by B&L had 20 brackets10 per side.

The Metal Fabricating Division was presently manufacturing the outrigger bracket. The subassembly partsT-67, T-75, T-69, and T-77were processed on a burn table, which cut the raw material to size. Although the burn table could work with eight stations, this machine had only been operating with one station. The final assembly operation, T-70, was performed at a manual welding station.

Manufacturing lead time for the outrigger bracket was two weeks. However, the Metal Fabricating Division had been able to coordinate supply and production with assembly operations. Consequently, finished inventory levels of the outrigger bracket were kept to a minimum. B&Ls inventory holding costs were 20 percent per annum.

THE OUTSOURCING DECISION

In an effort to reduce costs, the purchasing agent, Alison Beals, who reported to Brian Wilson, solicited quotes from three local companies to supply the outrigger bracket. Mayes Steel Fabricators (Mayes), a current supplier to B&L for other components, offered the lowest bid, with a cost of $108.20, FOB B&L.

Brian met with the controller, Mike Carr, who pro-vided a breakdown of the manufacturing costs for the outrigger bracket. Looking at the spreadsheet, Mike commented: These are based on estimates of our costs from this years budget. Looking at the material, labor, and overhead costs, I would estimate that the fixed costs for this part are in the area of about 20 percent. Keep in mind that it costs us about $75 to place an order with our vendors. Exhibit 1 provides B&Ls internal cost breakdown and details from the quote from Mayes.

image text in transcribed

Brian expected that B&L would have to arrange for extra storage space if he decided to outsource the outrigger bracket to Mayes, who had quoted delivery lead time of four weeks. Because Mayes was local and had a good track record, Brian didnt expect the need to carry much safety stock, but the order quantity issue still needed to be resolved.

B&L was operating in a competitive environment and Brian had been asked by the division general manager to look for opportunities to reduce costs. As he sat down to review the information, Brian knew that he should make a decision quickly if it was possible to cut costs by outsourcing the outrigger bracket.

Exhibit 1: Manufacturing Costs and Mayes Quote: Outrigger Bracket T-178 B&L Manufacturing costs Mayes Steel Fabricators Parts $14.60 $17.92 T-67 T-75 21.10 17.92 T-69 18.50 45.20 13.00 10.37 T-77 T-70 41.00 58.69 Total $108.20 $150.10 Exhibit 1: Manufacturing Costs and Mayes Quote: Outrigger Bracket T-178 B&L Manufacturing costs Mayes Steel Fabricators Parts $14.60 $17.92 T-67 T-75 21.10 17.92 T-69 18.50 45.20 13.00 10.37 T-77 T-70 41.00 58.69 Total $108.20 $150.10

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Concepts And Practice Of Mathematical Finance

Authors: Mark S. Joshi

2nd Edition

0521514088, 9780521514088

More Books

Students also viewed these Finance questions