Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

REFER TO ROADWAY DRAWINGS FOR PROPOSED GUARDRAIL LOCATIONS AND 3.0m PAVED SHOULDER -1,80m BLACK VINYL CHAIN-UNK FENCE PER OPSD 972.130 POST SUPPORT WITH SLEEVE-IT 1224R

image text in transcribedimage text in transcribed
image text in transcribedimage text in transcribed
REFER TO ROADWAY DRAWINGS FOR PROPOSED GUARDRAIL LOCATIONS AND 3.0m PAVED SHOULDER -1,80m BLACK VINYL CHAIN-UNK FENCE PER OPSD 972.130 POST SUPPORT WITH SLEEVE-IT 1224R SYSTEM BY NILEY OR APPROVED ALTERNATE FILLED WITH CONCRETE HIGH - 500 (MIN) GRADE EL 1.0 m 2.5(MN)\\SWALE 481 EXISTING GROUND 200 CLAY CAP-/ EXISTING GROUND 4.0 m 1.5 m 25M @ 303) 35M @ 300 15M 8 300- 25N @ 150 354 0 150 150x160 KEY L 15M @ 300- -900- 15m @ 300- 25m @ 1500- -1500- -SHEAR KEY 1200 J. 750 4050 BOO0 SECTION SCALE 1:50The preliminary design drawing (cross section) for the retaining wall of project XYZ is shown below (PDF file is attached). The length of the retaining wall = 20.0 n1. The retaining wall should be constructed in 4 steps. Each step will have 5-meter in length. It is required to: 1. Develop work breakdown structure for the retaining wall (30%). 2. Develop bar chart and activity network for the retaining wall (30%). 3. Determine project duration. Use your engineering knowledge to determine the construction duration for each activity (40%)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Tourism Concepts And Practices

Authors: John R Walker, Josielyn T Walker

1st Edition

0138142459, 9780138142452

More Books

Students also viewed these General Management questions

Question

What are the major advantages of dollar-value LIFO?

Answered: 1 week ago

Question

2. I try to be as logical as possible

Answered: 1 week ago