Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Refer to Table S6.1-Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer

Refer to Table S6.1-Factors for Computing Control Chart Limits (3 sigma) for this problem. Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Hour 1 2 3 4 5 6 X 3.25" 3.10 3.22 3.39 3.07 2.86 R 0.71" 1.18 1.43 1.26 1.17 0.32 Hour X 7 3.05" 8 2.65 3.02 2.85 9 10 11 1.33 2.83 1.17 12 2.97 0.40 Hour X R Hour 3.11" 0.85" 19 R 0.53" 13 1.13 14 0.71 15 2.83 1.31 20 3.12 1.06 21 2.84 0.50 22 16 17 2.86 1.43 23 18 2.74 1.29 24 X R 3.41" 1.61" 2.89 1.09 2.65 1.08 3.28 0.46 2.94 1.58 2.64 0.97 Based on the sampling done, the control limits for 3-sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCL) = inches (round your response to three decimal places). Lower Control Limit (LCL) = inches (round your response to three decimal places). Based on the x-chart, the wire cutting process has been OUT OF CONTROL The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCLR) = Lower Control Limit (LCLR) = inches (round your response to three decimal places). inches (round your response to three decimal places).
image text in transcribed
Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Based on the sampling done, the control limits for 3 -sigma x chart are (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCLx)= inches (round your response to three decimal places). Lower Control Limit (LCLx)= inches (round your response to three decimal places). Based on the x-chart, the wire cutting process has been The control limits for the 3-sigma R-chart ale (round all intermediate calculations to three decimal places before proceeding with further calculations): Upper Control Limit (UCLR)= inches (round your response to three decimal places). Lower Control Limit (LCLR)= inches (round your response to three decimal places)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Brand Management Building Measuring And Managing Brand Equity

Authors: Kevin Lane Keller

3rd Edition

0131888595, 9780131888593

More Books

Students also viewed these General Management questions

Question

What is meant by organisational theory ?

Answered: 1 week ago

Question

What is meant by decentralisation of authority ?

Answered: 1 week ago

Question

Briefly explain the qualities of an able supervisor

Answered: 1 week ago

Question

Define policy making?

Answered: 1 week ago

Question

Define co-ordination?

Answered: 1 week ago

Question

List the activities involved in employer-designed HRD programs

Answered: 1 week ago