Required: 1. What is the company's plantwide overhead rate? (Round your answer to 2 decimal places.) Predetermined overhead rate $ 25.90 per DLH 2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Manufacturing overhead allocated Product Y Product Z $ 230 510 $ 28.490 3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places Activity rato per MH 4. What is the activity rate for the Machine Setups activity cost pool? Activity rate per setup 5. What is the activity rate for the Product Design activity cost pool? Activity rate per product Foundational (LO4-1, LO4-2, LO4-3, L04-4) Greenwood Company manufactures two products-14,000 units of Product Y and 6,000 units of Product Z The company uses a plantwide overhead rate based on direct labor-hours. It is considering Implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: Estimated Overhead Expected Activity Cost Pool Activity Measure Cost Activity Machining Machine-hours $ 209,000 10,000 MHS Machine setups Tumber of setups $ 171,100 290 setups Production design Number of products $ 93,000 2 products General factory Direct labor-hours $ 259,000 10,000 DLH Activity Measure Machining Number of setups Number of products Direct labor hours Product 8,900 50 1 3,900 Product 1,100 24e 1 1,100 Foundational 4-6 6. What is the activity rate for the General Factory activity cost poole (Round your answer to 2 deelmal places.) Activity rate Der OLH