Required Information Greenwood Company manufactures two products---13,000 units of Product Y and 5,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering Implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional Information is avallable for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups Nuber of products Direct labor. hours Estimated Overhead Cost $ 201,600 3 55.900 77,000 $364,500 Expected Activity 12,00 M 15 setups 2products 35,00 LMS product Activity Mature Machining Number of setups Number of products birect labor hours Product 2 4.70 90 40 10. Using the ABC system how much total manufacturing overhed cost would be assigned to Procuct Z? (Round your intermediate calculations to 2 decimal places. Round your answers to the nearest dollar amount.) Ta manufacturing overhead Surved hapter Four i Required Information Greenwood Company manufactures two products-13,000 units of Product Y and 5,000 units uses a plantwide overhead rate based on direct labor-hours. It is considering implementing a (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following available for the company as a whole and for Products Y and Z: Activity Cost Pool Machining Machine setups Production design General factory Activity Measure Machine-hours Number of setups Number of products Direct labor-hours Estimated Overhead Cost $ 231,689 $ 55,988 5 27, 5364,50e Expected Activity 12, eee MHS 138 setups 2 products 15 Bae DLHS Product z Activity Measure Machining Number of setups Number of products Direct labor-OUES Product Y Bee 48 1 1 2780 Using the ABC system. how much total manufacturing overhead cost would be assigned to Prox alculations to 2 decimal places. Round your answers to the nearest dollar amount) manufacturing overhed 5