Required information Hickory Company manufactures two products15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based

Required information

Hickory Company manufactures two products15,000 units of Product Y and 7,000 units of Product Z. The company uses a plantwide overhead rate based on direct labour-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z:

Activity Measure

Estimated Overhead Cost

Expected Activity

Machining

Machine-hours

$

227,700

11,000

MHs

Machine setups

Number of setups

$

153,900

270

setups

Production design

Number of products

$

91,000

2

products

General factory

Direct labour-hours

$

257,000

13,200

DLHs

Activity Measure

Product Y

Product Z

Machine-hours

7,700

3,300

Number of setups

60

210

Number of products

1

1

Direct labour-hours

8,700

4,500

Required:

What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.)

Activity rate

per MH

Required:

What is the activity rate for the Machine Setups activity cost pool?

Activity rate

per setup

Required:

What is the activity rate for the Product Design activity cost pool?

Activity rate

per product

Required:

What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.)

Activity rate

per DLH

Required:

Which of the four activities is a batch-level activity?

  • Machining activity
  • General factory activity
  • Product design activity
  • Machine setups activity

Required:

Which of the four activities is a product-level activity?

  • Machining activity
  • Product design activity
  • General factory activity
  • Machine setups activity

Required:

Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Do not round intermediate calculations and round your final answer to the nearest dollar amount.)

Total manufacturing overhead cost

Required:

Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Do not round intermediate calculations and round your final answer to the nearest dollar amount.)

Total manufacturing overhead cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing Diversity In Library Collections

Authors: Rosalind Washington, Sarah Voels

1st Edition

1440878749, 978-1440878749

More Books

Students also viewed these Accounting questions

Question

How satisfied are you with this attitude?

Answered: 1 week ago

Question

Where is your key public located geographically?

Answered: 1 week ago

Question

What is the socioeconomic status of your key public?

Answered: 1 week ago