Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

! Required information Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro

image text in transcribedimage text in transcribed

image text in transcribedimage text in transcribed

! Required information Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.] Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Materials Other Overhead Indirect Labor $360,000 $145,000 Production Activity Grinding Polishing Product modification Providing power System calibration 600,000 $210,000 560,000 Additional information on the drivers for its production activities follows. Grinding Polishing Product modification Providing power System calibration 9,000 machine hours 9,000 machine hours 1,800 engineering hours 14,000 direct labor hours 150 batches Job 4286 2,625 units 2,500 MH Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 210 units 250 MH 33 eng. hours 10 batches 490 DLH 22 eng. hours 30 batches 4,410 DLH Problem 17-3A Part 1 Required: 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibration Problem 17-3A Parts 2, 3 & 4 Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing activities into a single cost pool. Determine overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.) Job 3175 Job 4286 Activity driver Overhead incurred assigned Activity Overhead Cost Activity Drivers Activity Rate Overhead assigned Activity driver incurred Grinding & Polishing Machine hours Product modification Engineering hrs. Providing power Direct labor hrs. System calibration batches Problem 17-3A Part 5 Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit Job 3175 Job 4286

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting For School Administrators Tools For School

Authors: Ronald E. Everett, Donald R. Johnson, Bernard W. Madden

3rd Edition

1610487710, 978-1610487719

More Books

Students also viewed these Accounting questions