Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Required information Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 (The following information applies to the questions displayed below.) Craft Pro Machining
Required information Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 (The following information applies to the questions displayed below.) Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Indirect Materials Other Overhead Indirect Labor $400,000 Production Activity Grinding Polishing Product modification Providing power System calibration $190,000 550,000 $215,000 450,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 20,000 machine hours 1,500 engineering hours 20,000 direct labor hours 1,000 batches Job 3175 200 units 300 MH Job 4286 2,500 units 3,000 MH Number of units Machine hours Engineering hours Batches Direct labor hours 34 eng. 24 eng. hours hours 10 batches 520 DLH 30 batches 4,680 DLH Problem 17-3A Part 1 Required: 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibration Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing costs into a single cost pool. Determine overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned" to the nearest whole dollar.) Job 3175 Job 4286 Activity driver Overhead incurred assigned Activity Overhead Cost Activity Drivers Activity Rate Overhead assigned Activity driver incurred Grinding & Polishing Machine hours Product modification Engineering hrs. Providing power Direct labor hrs. System calibration batches Required: 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit Job 3175 Job 4286
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started