Required information Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 The following information applies to the questions displayed below) Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Materials Other Overhead Grinding Indirect Labor $350,000 $180,000 400,000 Polishing Product modification Providing power System calibration $250.000 540,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 10,000 machine hours 1,700 engineering hours 17,000 direct labor hours 700 batches Number of units Machine hours Engineering hours matches Direct labor hours Job 3175 190 unita 300 M 20 eng. hours 10 batehen 420 DLI Job 4286 2,375 unit 3,000 MII eng. 20 Foto 30 batchen 3,780 L Problem 17-3A Part 1 Required: 1. Classify each activity as unit level, batch level, product level, or facility level. Grinding Polishing Product modification Providing power System calibration Problem 17-3A Parts 2, 3 & 4 Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing costs into a single cost overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the o unit for Job 4286? (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "over to the nearest whole dollar.) Overhead Cost Activity Rate Activity Grinding & Polishing Product modification Activity Drivers Machine hours Engineering hrs. Direct labor hrs. Providing power System calibration batches Job 3175 Activity driver incurred Overhead assigned Job 4286 Activity driver Overhead incurred assigned