Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Required information {The following information applies to the questions displayed below.) Knickknack, Inc., manufactures two products: Odds and Ends. The firm uses a single, plantwide

image text in transcribed
image text in transcribed
image text in transcribed
Required information {The following information applies to the questions displayed below.) Knickknack, Inc., manufactures two products: Odds and Ends. The firm uses a single, plantwide overhead rate based on direct-labor hours. Production and product-costing data are as follows: Production quantity Direct material Direct labor (not including setup time) Manufacturing overhead Total cost per unit Odds 1,000 units $ 40 30 (2 hr. at $15) 96 (2 hr. at $48) $ 166 Ends 5,000 units $ 60 45 (3 hr. at $15) 144 (3 hr, at $48) $ 249 Manufacturing overhead budget: Machine-related costs Setup and inspection Engineering Plant-related costs Total $450,000 180,000 90,000 96,000 $816,000 Predetermined overhead rate: Predetermined overhead rate: Budgeted manufacturing overhead $816,880 Budgeted direct-labor hours (1,000) (2) + (5,000) (3) = $48 per direct-labor hour Knickknack, Inc., prices its products at 120 percent of cost, which yields target prices of $199.20 for Odds and $298.80 for Ends. Recently, however, Knickknack has been challenged in the market for Ends by a European competitor, Bricabrac Corporation. A new entrant in this market, Bricabrac has been selling Ends for $220 each. Knickknack's president is puzzled by Bricabrac's ability to sell Ends at such a low cost. She has asked you (the controller) to look into the matter. You have decided that knickknack's traditional, volume-based product-costing system may be causing cost distortion between the firm's two products. Ends are a high- volume, relatively simple product. Odds, on the other hand, are quite complex and exhibit a much lower volume. As a result, you have begun work on an activity-based costing system. Budgeted level of Activity Cost Pool Cost Driver Cost Driver Machine-related costs Machine hours 9,000 hr. Setup and inspection Number of production runs 40 runs Engineering Engineering change orders 100 change orders Plant-related costs Square footage of space 1,920 sq. ft. . You have gathered the following additional information: Each odd requires 4 machine hours, whereas each end requires 1 machine hour. Odds are manufactured in production runs of 50 units each Ends are manufactured in 250- unit batches Three-quarters of the engineering activity, as measured in terms of change orders, is related to Odds. The plant has 1,920 square feet of space, 80 percent of which is used in the production of Odds . 3. Determine the unit cost, for each activity cost pool, for Odds and Ends. (Round your intermediate calculations to 2 decimal places. Round "Engineering" and "Plant-related costs" to 2 decimal places.) Odds Ends 77 s 4 Machine-related costs Setup and inspection Engineering Plant-related costs

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Forecasting Volatility In The Financial Markets

Authors: Stephen Satchell, John Knight

2nd Edition

0750655151, 9780750655156

More Books

Students also viewed these Accounting questions

Question

List the major functions performed by the DBMS

Answered: 1 week ago