Question

1 Approved Answer

required to fill out BoQ sheet which at least contains the information below. Item Description Quantity Unit Rate Total PREAMBLES Blanks to be filled out...

image text in transcribedimage text in transcribed

required to fill out BoQ sheet which at least contains the information below.

ItemDescriptionQuantityUnitRateTotal
PREAMBLES
Blanks to be filled out...
GENERAL
Blanks to be filled out...
EARTHWORKS
Cut volume for proposed levelm3
Fill volume for proposed levelm3
ROAD PAVEMENT
Stabilized crushed stone - 50 mmm2
Compacted gravel base - 100 mmm2
Subbase - 600 mmm2
Interlocking paving block - 60 mmm2
Coarse sand bedding - 50 mmm2
Mass concrete subbase - 100 mmm2
Concrete curb - 150 mm x 250 mmm3

2. Measurement details (60%)

2.1 Please present the tables below in the assessment.

For road:In the table, '+' is cut, and '-' is fill

Depth matrixABCDEFGH
1
2
Depth matrixIJKLMNOP
1
2

For building pad:In the table, '+' is cut, and '-' is fill

Depth matrixabcd
1
2
3

2.2 Please demonstrate the calculation steps for each grid by grid method, average end area method, or prismoidal method.

2.3 Please fill out the table below to indicate the cut and fill schedules.

Topography - RoadCutFillNet cut/fill
Topography - BuildingCutFillNet cut/fill
Topography - TotalCutFillNet cut/fill

2.4 Please present the screenshot of your measurement for Part 2 Road pavement, if you use software (i.e. CostX) to do so. Otherwise,

image text in transcribedimage text in transcribedimage text in transcribed
125000 LEGEND: ROAD CENTRAL LINE 500 8700 500 CONTOUR LINE OF ORIGINAL TOPOGRAPHY GRAVEL ROAD 500 (SEE CROSS SECTION DESIGN ELEVATION DRAWING FOR DETAILS) 1000 500 NOTE: 30000 BUILDING BUILDING BUILDING LOT 1 LOT 2 LOT 3 1. UNIT: mm 500 500 500 15000 15000 15000 PROPOSED ROAD AND BUILDING LOT LAYOUTHARD SHOULDER ROAD WAY SIDEWALK 1200 3000 3000 NOTE: 1. UNIT: mm 1500 750 T k CONCRETE CURB 150mm x 250mm SUBBASE 600mm CROSS SECTION FOR GRAVEL ROAD STABILIZED CRUSHED STONE 50mm COMPACTED GRAVEL BASE 100mm INTERLOCKING PAVING BLOCK 60mm COARSE SAND BEDDING 50mm MASS CONCRETE SUBBASE 100mm 1. Drawing a grid at 8.7m intervals both ways for road 2. Drawing a grid at 15m intervals both ways for building pad Grid level matrix A B C D E F G H Grid level matrix a b C D 0.24 0.52 0.70 0.89 0.97 0.97 0.98 0.99 1.03 1.05 1.06 1.02 2 0.22 0.50 0.68 0.90 1.02 1.04 1.05 1.06 2 0.62 0.70 0.77 0.88 Grid level matrix 3 K L M N 0.15 O 0.18 0.18 P 0.20 1.00 0.90 0.94 0.7 0.54 0.4 0.10 0 2 1.06 1.04 1.02 0.96 0.73 0.49 0.24 0 125000 B LEGEND: C D E F G H J K L M N O 500 - ROAD CENTRAL LINE 8700 b 500 CONTOUR LINE OF ORIGINAL TOPOGRAPHY 8/00 GRAVEL ROAD 500 SEE CROSS SECTION DESIGN ELEVATION DRAWING FOR DETAILS) 1000 500 30000 BUILDING BUILDING BUILDING N LOT 1 NOTE: LOT 2 LOT 3 1. UNIT: mm 500 500 500 1500 2 15000 15000 15000 PROPOSED ROAD AND BUILDING LOT LAYOUT

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Retail Management A Strategic Approach

Authors: Barry Berman, Joel Evans, Patrali Chatterjee

13th Edition

0133796841, 9780133796841

More Books

Students also viewed these General Management questions

Question

What are two of the drawbacks to audio output?

Answered: 1 week ago

Question

Where did the faculty member get his/her education? What field?

Answered: 1 week ago

Question

How do the two components of this theory work together?

Answered: 1 week ago

Question

Always have the dignity of the other or others as a backdrop.

Answered: 1 week ago