Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Roads in consistently wet regions: Question 17Select one: A. Pending suitable drainage, should be constructed during the height of the wettest time of year to
Roads in consistently wet regions: Question 17Select one: A. Pending suitable drainage, should be constructed during the height of the wettest time of year to ensure the design capability matches the peak site requirements. B. Design the gradients in cuttings where drainage is to the front and thence to the exterior, this will ensure better control of water flows in the future. C. Need to have cuttings and embankment surfaces draining as soon as they are completed to ensure that water does not accumulate in these depressions
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started