Rocky Mountain Corporation makes two types of hiking boots-Xactive and Pathbreaker. Data concerning these two product lines appear below: Direct materials per unit Direct labor cost per unit Direct labor hours per unit Estimated annual production and sales Xactive 5 65.10 $ 18.50 1.4 DLHS 28,000 units Pathbreaker $ 51.30 $ 13.30 1 DHS 78,000 units The company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming yeat appear below Estimated total manufacturing overhead istisited total direct labor.bours $2,70,160 112,200 US Required: 1-a. Compute the predetermined overhead rate based on direct labor hours. 1-6. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product 2. The company is considering replacing its conventional costing system with an activity based costing system that would assign its manufacturing overhead to the following four activity cost pools, Activity Controls and Activity Measures Sindirect la direct her.hu Estimated Overhead Coat AR Expected Mtivity Xactive Rathbreaker Total 19 7. 117 200 Required: 1-a. Compute the predetermined overhead rate based on direct labor hours. 1-b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product. 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: Activity Cost Pools and Activity Measures Supporting direct labor (direct labor hours Batch setups (setups) Product sustaining (number of products) General factory (machine-hours) Total manufacturing overhead cost Estimated Overhead Cost $367,200 795,500 637,940 78,440 $2,379,160 Expected Activity Xactive Pathbreaker Total 39,200 78,000 117,200 265 165 430 1 1 2 2,800 7,800 10,600 Determine the activity rate for each of the four activity cost pools 3. Using the activity rates and other data from the problem, determine the unit product cost of each product Answer is complete but not entirely correct. Complete this question by entering your answers in the tabs below. Req IA Req 16 Reg 2 Reg 3