Rocky Mountain Corporation makes two types of hiking boots-Xactive and Pathbreaker. Data concerning these two product lines appear below: $ $ Xactive 65.30 18.70 1.4 DLHS 30.000 units Direct materials per unit Direct labor cost per unit Direct labor-hours per unit Estimated annual production and sales S $ Pathbreaker 51.se 13.5e 1 DLHS 80,000 units The company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below: Estimated total manufacturing overhead Estimated total direct labor-hours $2,501.000 122,000 DLHS Required: 1-a. Compute the predetermined overhead rate based on direct labor-hours. 1-b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: Estimated Overhead Cost S 915,000 877.se 626.000 82.500 $2,501,000 Activity Cost Pools and Activity Measures Supporting direct labor (direct labor-hours) Batch setups (setups ) Product sustaining (number of products) General factory (machine-hours) Total manufacturing overhead cost Expected Activity Xactive Pathbreaker Total 42.000 80,000 122,000 275 450 1 3,000 8,000 11,000 175 Complete this question by entering your answers in the tabs below. Req 1A Req 1B Reg 2 Reg 3 Compute the predetermined overhead rate based on direct labor-hours. (R Predetermined overhead rate per DLH Req Complete this question by entering your answers in the tabs below. Reg 1A Reg 1B Req 2 Req3 Using the predetermined overhead rate and other data from the problem, determine the product. (Round your intermediate calculations and final answers to 2 decimal places.) Xactive Pathbreaker Unit product cost Complete this question by entering your answers in the tabs below. Req 1A Req 1B Reg 2 Req 3 Determine the activity rate for each of the four activity cost pools. (Round your per decimal places.) Activity Cost Pools Supporting direct labor Batch setups Product sustaining General factory Activity Rate per DLH Iper setup per product per MHR Complete this question by entering your answers in the tabs below. Req 1A Req 1B Reg 2 Reg 3 Using the activity rates and other data from the problem, determine the unit produ intermediate calculations and final answers to 2 decimal places.) Xactive Pathbreaker Unit product cost