Rocky Mountain Corporation makes two types of hiling boots - Xactive and Pathbreaker Data concerning these two product lines appear below Direct materials per unit Direct labor cost per unit Direct labor-hours per unit Estimated annual production and sales Xacta $64.00 $ 17.40 1.4 D 17,000 units Pathbreaker $ 50.20 $ 12.20 1 DLHS 67,000 units The company has a conventional costing system in which manufacturing overhead is applied to units based on direct labor-hours. Data concerning manufacturing overhead and direct labor-hours for the upcoming year appear below. Estimated total manufacturing overhead Estimated total direct labor-hours $1,743, 360 90,800 Du Required: 1a. Compute the predetermined overhead rate based on direct labor-hours. 1.b. Using the predetermined overhead rate and other data from the problem, determine the unit product cost of each product 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools: Activity Cost Pools and Activity Measures Supporting direct labor (direct labor-hours) Batch setups (setups) Product sustainine (number of products) General Factory (machine-hours) Total manufacturing overhead cost Estimated Overhead Cast $ 621,980 416,000 647.540 57.540 31,743, 360 Expected Activity Xective Pathbreaker Total 23,800 67,000 90, 800 210 110 320 1 1 2 1,700 6.700 8,400 ELULUU Estimated total direct labor-hours > 90, DHS Required: 1-0 Compute the predetermined overhead rate based on chectiobor hours. 1-b. Using the predetermined overhead rate and other data from the problem determine the unit product cost of each product 2. The company is considering replacing its conventional costing system with an activity-based costing system that would assign its manufacturing overhead to the following four activity cost pools Estimated Overhead Cost $621,950 416,000 647,840 57.54 $1,743,360 Activity Cost Pools and Activity Measures Supporting direct labor (direct labor hours) Batch Setups (setups) Product sustaining (number of products) General factory (machine-hours) Total manufacturing overhead cost Expected Activity Xactive Pathbreaker Total 23,00 62,000 90,000 110 320 1 1 2 1,700 6,700 8,400 210 Determine the activity rate for each of the four activity cost pools 3. Using the activity rates and other data from the problem, determine the unit product cost of each product. Complete this question by entering your answers in the tabs below. Reg 13 Reg 1A Reg 3 Reg 2 Compute the predetermined overhead rate based on direct labor-hours. (Round your answer to 2 decimal places.) Prodetermined overhead rate per DLH Rent Reg 1B > Nex