Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Runner Company has been allocating overhead to individual product lines based on each line's relative shares of direct labor hours. For the upcoming year, the

image text in transcribed

image text in transcribed

image text in transcribed

Runner Company has been allocating overhead to individual product lines based on each line's relative shares of direct labor hours. For the upcoming year, the company estimated that manufacturing overhead will be $1,614,900 and estimated direct labor hours will be 117,000. The company also has the following estimates: Cost Pool Maintenance costs Setup costs Engineering costs Cost Driver Direct labor hours Number of setups Number of design changes Total Amount $ 596,700 433,200 585,000 $1,614,900 Total Amount of Activity 117,000 190 390 Among many other products, Runner has two switches, Standard and Elite switches. Standard switches are a high-volume product that the company makes in large batches, while Elite switches are a specialty product that is fairly low in sales volume. Information about Standard and Elite usage of the different activities follows: Standard 2,860 Direct labor hours Number of setups Number of design changes Elite 320 11 22 2 Calculate the predetermined overhead rate based on direct labor hours (traditional allocation). (Round answer to 2 decimal places, e.g. 15.25.) Predetermined overhead rate per DLH Use this predetermined overhead rate to calculate the amount of overhead to apply to Standard and Elite switches, based on their usage of direct labor hours. (Round answers to 0 decimal places, e.g. 125.) Standard Elite Overhead allocated LINK TO TEXT LINK TO TEXT Calculate the individual ABC pool rates by taking the total amount of overhead for each cost pool and dividing that total by the total amount of activity for that pool. (Round maintenance costs pool rate to 2 decimal places, e.g. 15.25 and other answers to 0 decimal places, e.g. 125.) Cost Pool Cost pool rate /DLH Maintenance costs $ Setup costs /setup Engineering costs /design change Allocate overhead to each of the two products using these three activity rates. (Round answers to 0 decimal places, e.g. 125.) Maintenance Costs Setup Costs Engineering Total MOH Standards A Elite A Compare the overhead calculated in part a to that calculated in part b. Which allocation method (traditional or ABC) most likely results in a better estimate of product cost? Click if you would like to Show Work for this question: Open Show Work

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions