Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Safety Products currently outsources an electrical switch that is a component in its sprinkler systems. The switches are purchased for $23 each. The company
Safety Products currently outsources an electrical switch that is a component in its sprinkler systems. The switches are purchased for $23 each. The company is considering making the switches internally and has conducted a study to determine the costs involved. The costs below are projected annual production costs: Unit-level material cost Unit-level labor cost Unit-level overhead Batch-level cost (9,000 units per batch) Product-level supervisory salaries Allocated facility-level costs $ $ 3 $ 2 $26,000 $48,000 $41,000 Assume that the company needs 18,000 of the switches, which would be produced in two batches. Assume also that the company will still be operating within the relevant range. If Safety decides to make the parts under these conditions, the total relevant costs will be: Multiple Choice $262,000. $303,000. $277,000. $236,000.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started