Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

SAN Design Scenario 2: The IT infrastructure of an organization consists of three storage arrays direct-attached to a heterogeneous mix of 45 servers. All servers

SAN Design Scenario 2: The IT infrastructure of an organization consists of three storage arrays direct-attached to a heterogeneous mix of 45 servers. All servers are dual-attached to the arrays for high availability. Because each storage array has 32 front-end ports, each could support a maximum of 16 servers. However, each existing storage array has the disk capacity to support a maximum of 32 servers. The organization plans to purchase 45 more servers to meet its growth requirements.

If it continues using direct-attached storage, the organization needs to purchase additional storage arrays to connect these new servers. The organization realizes that its existing storage arrays are poorly utilized; therefore, it plans to implement FC SAN to overcome the scalability and utilization challenges. The organization uses high-performance applications; therefore, it wants to minimize the hop count for the server's access to storage.

Analysis, Calculations, and Proposed Solution: Full mesh topology is not suitable for an environment that requires high scalability. Partial mesh provides more scalability than full mesh - but several hops or ISLs may be required for the network traffic to reach its destination. Therefore, the recommended solution for this scenario is core-edge topology. The core-edge topology provides higher scalability than mesh topology and provides one-hop storage access to all servers in the environment. Because of the deterministic pattern (from the edge to the core) of FC traffic movement, it is easy to calculate traffic load distribution across ISLs.

  • Total number of server ports = 90 servers x 2 ports = 180 ports
  • Total number of array ports = 3 arrays x 32 ports = 96 array ports
  • Number of switches at the core = 96 array ports/72 ports per switch = approximately 2 switches. The core switches provide 144 ports of which 96 ports will be used for array connectivity. The remaining 48 ports can be used for ISLs and future growth.
  • Number of switches at the edge = 180 server ports/72 ports per switch = approximately 3 switches. The edge switches provide 216 ports of which 180 ports will be used for server connectivity. The remaining 36 ports can be used for ISLs and future growth.
  • Number of edge switch ports used for connecting to core switches = 6, which is less than the remaining edge switch ports.
  • Number of core switch ports used for connecting to edge switches = 6, which is less than the remaining core switch ports.

So, at a minimum, two core switches and three edge switches are required to implement the core-edge fabric.

Your Task: Using Microsoft Visio, draw a topology diagram for the solution above. Export your Visio diagram as a .jpg or .gif image file and insert the diagram into a Microsoft Word document. Tip: If you need a stencil that is not in your Visio Shapes library, www.visiocafe.com is a good resource for Visio stencils.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Securing SQL Server Protecting Your Database From Attackers

Authors: Denny Cherry

3rd Edition

0128012757, 978-0128012758

More Books

Students also viewed these Databases questions

Question

DESCRIBE behaviour that could constitute haras sment.

Answered: 1 week ago