Sawaya Co., Ltd., of Japan, is a manufacturing company whose total factory overhead costs fluctuate considerably from year to year according to increases and decreases
Sawaya Co., Ltd., of Japan, is a manufacturing company whose total factory overhead costs fluctuate considerably from year to year according to increases and decreases in the number of direct labour-hours worked in the factory. Total factory overhead costs (in Japanese yen, denoted ) at high and low levels of activity for recent years are provided below: Level of Activity Low High Direct labour-hours 230,000 280,000 Total factory overhead costs 12,334,000 13,789,000 The factory overhead costs above consist of indirect materials, rent, and maintenance. The company has analyzed these costs at the 230,000-hour level of activity as follows: Indirect materials (V) 5,060,000 Rent (F) 5,012,000 Maintenance (M) 2,262,000 Total factory overhead costs 12,334,000 V = variable; F = fixed; M = mixed. To have data available for planning, the company wants to break the maintenance cost down into its variable and fixed cost elements. Required:
1. Estimate how much of the 13,789,000 factory overhead cost at the high level of activity consists of maintenance cost. (Hint: To do this, it may be helpful to first determine how much of the 13,789,000 consists of indirect materials and rent. Think about the behaviour of variable and fixed costs!)
2. By means of the high-low method of cost analysis, estimate a cost formula for maintenance. (Round the "Variable cost" to 2 decimal places.)
3. What total factory overhead costs would you expect the company to incur at an operating level of 72,000 direct labour-hours? (Do not round intermediate calculations.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started