Answered step by step
Verified Expert Solution
Question
1 Approved Answer
*SELECTION OF DESIGN* Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will
- *SELECTION OF DESIGN* Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 16 hours of lathe time and 4.5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 12 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling. a. Which design should be adopted? b. What is the annual savings over the other design if 125,000 units are sold each year?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started