Seme studies were conducted in a Pan manufacturing industry to address the quality related problems and improve their quality level by implementing the wave tools of quality, low chart, Check sheet, Histogram, Caffect dingram, Pareto chart, Scatter ding Control charts were implemented to define the problem, mert med, find out its root und is removal to ensure the production of nondefective me The work was carried out in "Fecto Fan Company". There were two sections in the plant manufacturing and writing. The study found that there were total five types of defects occuring in an manufacturing process. Defects are as below: 1 3 Type of Defects Defect Differences between sireUpper and lower Ribbon (URL) 2 Shorter length of Downlod (DK) Variation in wire of Canopy (VC) Blade lange under sine (BF) Steel Ribbon oversie (SK) The goal was to eliminate all these problems and to ensure flawless manufacturing process. For this purpose basic seven tools of quality were applied Data on a total of 7578 units produced was collected through check sheet for 30 days and the results are shown in the table below. Table Check Sheet for various modes of defects with frequency and percentage Type of Defects Rejected % Rejected 363 54.50% 2 112 1681% 3 92 13.81% 11.71% 21 3.15% Total 666 100% 4 Evaluate how implementing Check sheet helped to address quality related problems. (14 mart) Seme studies were conducted in a Pan manufacturing industry to address the quality related problems and improve their quality level by implementing the wave tools of quality, low chart, Check sheet, Histogram, Caffect dingram, Pareto chart, Scatter ding Control charts were implemented to define the problem, mert med, find out its root und is removal to ensure the production of nondefective me The work was carried out in "Fecto Fan Company". There were two sections in the plant manufacturing and writing. The study found that there were total five types of defects occuring in an manufacturing process. Defects are as below: 1 3 Type of Defects Defect Differences between sireUpper and lower Ribbon (URL) 2 Shorter length of Downlod (DK) Variation in wire of Canopy (VC) Blade lange under sine (BF) Steel Ribbon oversie (SK) The goal was to eliminate all these problems and to ensure flawless manufacturing process. For this purpose basic seven tools of quality were applied Data on a total of 7578 units produced was collected through check sheet for 30 days and the results are shown in the table below. Table Check Sheet for various modes of defects with frequency and percentage Type of Defects Rejected % Rejected 363 54.50% 2 112 1681% 3 92 13.81% 11.71% 21 3.15% Total 666 100% 4 Evaluate how implementing Check sheet helped to address quality related problems. (14 mart)