- Shift time (Design Capacity)= 8 hours
- Meal Break=Lunch time (Unpaid time=0,5 hours
- Cycle time (Nominal (theoretical) sec/unit)=15,2sec/unit
- Short breaks (Tea time) =9.45-10.00 and 14.15-14.30
- Downtime (time/day the sum of all the interruptions ): 1 hour
- Number of total pieces= 1500 unit
- Number of defects=100 unit
time unit 288.00 1898,901 Rpproach 1 Ava bability Eric! eney Rela blity Berg 1800 27000 1780,22 0,975 Availability Shift Tength: hours Meal Break 1 Available time Shot Breaks ON 215min tea time Downtime sec/day Total Production time Available time) 1800 3600 21600 1424,176 0,8 Eficiency unit time 1500 221750 105 Performance of the cell 100 1516.662 0.98. Throu put yield TPY Number of pieces (total) Number of de tacts Good pieces Nominal the RSC all output sec/unit 1400 21333,33 0,74 OEE 15,2 1400 EO b)Fill the EPE table based on Shift Time (Design Capacity) and Actual Output [Number of total pieces) 21600 14,4 1500 9,75 0.79 1,05 28800 15,2 1898,901 1,05 c)Fill the EPE table based on Available Time and Actual Output (Number of total pieces) 21600 14,40 1500 0,80 0,84 1,05 27000 15,2 1780, 22 1,05 d)Filtthe EPE table based on Shift Time (Design Capacity) and Actual Output (Number of good pieces) 2:1600 15,41 1400 0,75 0,74 0,98 28800 15,2 1898,901 0,98 e)Fill the EPE table based on Available Time and Actual Output (Number of good pieces) 21600 15,4 1400 0,80 0,79 0,98 270001 15,2 1730, 22 0,58 fif the number of good pieces should be exactly the number of total pieces (constraints: Availability, Tea time, downtime, Throughput Yield, Cycle time are NOT Changed) update your OEE Table and make your comments. Some comments can be found in OEECase(Comments).xlsx time unit 28000 1998,901 Avalable Relati SOO 27000 1780,72 Q.9875 Avaikbay ShIR lang the haun Maal Graak 1 Available leme Short Braal 2015 min to me Downtime El Faciday Total Production time Callable sima) 3800 3800 216003424,175 0,8 efficiency unit fime VALUE Perfomance of the all #VALUE! Throughput yild Y Number of place tata) Numbarat de fact Gad el cas Nominal (the ratic al output sec/unit 1300 22 #VALUE! OBE 152 AVAUX EO time unit 28800 1898,901 . SHIRE length hours Meal rask 1 Avalable me Shot Break 2*15mia 1800 27000 1780 22 09873 O Availability 1800 3500 Downtime cy Total Preduction ma Aalto mas 21600 1434,176 08 HELSE unit time 1607,143 Sumber of Ple! tata Numer Ela fac Gaad 2475 Perfomance of the all 13 107 Otherheatywy 1500 22 0,79 Nominat autout sec/unit 1.2 1900 50 Se (Trkiye) WE g)if the number of good pieces should be exactly the number of total pieces (constraints: Availability, Tea time, Throughput Yield, Cycle time are NOT Changed, but, downtime has decreased to =15min) update your OEE Table and make your comments. Some comments can be found in OEECase(Comments).xlsx ms unit 7800 1898,901 1900 20000 1780,22 0.9CTS Avaikeitay Shift Icnych a hours MERT Brcaka Adilable Dime Short Becala 2 min Ice time Downtime unes day Total Producten ums Awailable Dime)- 1900 1500 73 700 1552,637 0.87.7778 efficiency unit time Performance of the call VALUE #VALUE! Throughput yoldIPY Number of picca (total) Number of defesa dood picca Nominal theoretic al) output sed unit 2500 22730 VALUE! DEE 15,2 #VALUE! ED sme unit E3 28800 1895,901 1800 27000 1780.22 Q9375 Availability Shits fanath hours Naal Break 15 Atalabla mo Short reaks 2015min Rama Downsime day Total Preduesen 2800 2500 lame (Available Elmo. 3700 15:37 038 Bificancy unit time Numbet placer Performance of the 1507.143 24378 2.00 107 2623 0.99 Throughput yild/TY 1300 23750 vel DEE Number of estaan G. Blo Nominal thearts UUT secunt 19.2 3800 EO E time unit 288.00 1898,901 Rpproach 1 Ava bability Eric! eney Rela blity Berg 1800 27000 1780,22 0,975 Availability Shift Tength: hours Meal Break 1 Available time Shot Breaks ON 215min tea time Downtime sec/day Total Production time Available time) 1800 3600 21600 1424,176 0,8 Eficiency unit time 1500 221750 105 Performance of the cell 100 1516.662 0.98. Throu put yield TPY Number of pieces (total) Number of de tacts Good pieces Nominal the RSC all output sec/unit 1400 21333,33 0,74 OEE 15,2 1400 EO b)Fill the EPE table based on Shift Time (Design Capacity) and Actual Output [Number of total pieces) 21600 14,4 1500 9,75 0.79 1,05 28800 15,2 1898,901 1,05 c)Fill the EPE table based on Available Time and Actual Output (Number of total pieces) 21600 14,40 1500 0,80 0,84 1,05 27000 15,2 1780, 22 1,05 d)Filtthe EPE table based on Shift Time (Design Capacity) and Actual Output (Number of good pieces) 2:1600 15,41 1400 0,75 0,74 0,98 28800 15,2 1898,901 0,98 e)Fill the EPE table based on Available Time and Actual Output (Number of good pieces) 21600 15,4 1400 0,80 0,79 0,98 270001 15,2 1730, 22 0,58 fif the number of good pieces should be exactly the number of total pieces (constraints: Availability, Tea time, downtime, Throughput Yield, Cycle time are NOT Changed) update your OEE Table and make your comments. Some comments can be found in OEECase(Comments).xlsx time unit 28000 1998,901 Avalable Relati SOO 27000 1780,72 Q.9875 Avaikbay ShIR lang the haun Maal Graak 1 Available leme Short Braal 2015 min to me Downtime El Faciday Total Production time Callable sima) 3800 3800 216003424,175 0,8 efficiency unit fime VALUE Perfomance of the all #VALUE! Throughput yild Y Number of place tata) Numbarat de fact Gad el cas Nominal (the ratic al output sec/unit 1300 22 #VALUE! OBE 152 AVAUX EO time unit 28800 1898,901 . SHIRE length hours Meal rask 1 Avalable me Shot Break 2*15mia 1800 27000 1780 22 09873 O Availability 1800 3500 Downtime cy Total Preduction ma Aalto mas 21600 1434,176 08 HELSE unit time 1607,143 Sumber of Ple! tata Numer Ela fac Gaad 2475 Perfomance of the all 13 107 Otherheatywy 1500 22 0,79 Nominat autout sec/unit 1.2 1900 50 Se (Trkiye) WE g)if the number of good pieces should be exactly the number of total pieces (constraints: Availability, Tea time, Throughput Yield, Cycle time are NOT Changed, but, downtime has decreased to =15min) update your OEE Table and make your comments. Some comments can be found in OEECase(Comments).xlsx ms unit 7800 1898,901 1900 20000 1780,22 0.9CTS Avaikeitay Shift Icnych a hours MERT Brcaka Adilable Dime Short Becala 2 min Ice time Downtime unes day Total Producten ums Awailable Dime)- 1900 1500 73 700 1552,637 0.87.7778 efficiency unit time Performance of the call VALUE #VALUE! Throughput yoldIPY Number of picca (total) Number of defesa dood picca Nominal theoretic al) output sed unit 2500 22730 VALUE! DEE 15,2 #VALUE! ED sme unit E3 28800 1895,901 1800 27000 1780.22 Q9375 Availability Shits fanath hours Naal Break 15 Atalabla mo Short reaks 2015min Rama Downsime day Total Preduesen 2800 2500 lame (Available Elmo. 3700 15:37 038 Bificancy unit time Numbet placer Performance of the 1507.143 24378 2.00 107 2623 0.99 Throughput yild/TY 1300 23750 vel DEE Number of estaan G. Blo Nominal thearts UUT secunt 19.2 3800 EO E