Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Sketch of Design Improvements: Top Screw (1) Block Top Screws (2) Lens (1) Blocks (2) Block Side Screws (2) All students answer all parts of

image text in transcribedimage text in transcribed

Sketch of Design Improvements:

image text in transcribed

Top Screw (1) Block Top Screws (2) Lens (1) Blocks (2) Block Side Screws (2) All students answer all parts of Problem 2 2. Perform a Hitachi Assembly analysis of lens holder (upper part of the picture below). Fill Design summary table below. Indicate suggestions to improve the design and reanalyze using Hitachi method. 9 SEE LABELED LENS ASSEMBLY DRAING FOR DETAILS ORIGINAL DESIGN PRODUCT: Part Level 1234 PART NAME # OF PART S (n) OPERATION SYMBOLS # OF OPERA TIONS (m) e 100+ e T=(1 00+Ze) Ton LENS 1 1 0 100 100 100 TOP SCREW BLOCK BLOCK TOP SCREW BLOCK SIDE SCREW Assembly Efficiency Rating: N=Zn: Ton: Assembly Cost Ratio (Redesign only): K=AT/ATO: E=N(100)/AT: Normalized Assembly Time ATZT.n/100: 8 9 10 2.05 2.20 2.35 m 1 2 3 4 5 6 1 a 1.15 > 10 0.85 0.150m 1.30 1.45 1.50 1.75 1.90 Total Assembly Time = (seconds); Design Efficiency (%) IMPROVED DESIGN PRODUCT: Part Level 1234 PART NAME # OF PART S (n) OPERATION SYMBOLS # OF OPERA TIONS (m) e 100+ e T=ce(1 00+Ze) Ton N=Zn: Ton: Assembly Efficiency Rating: E=N(100)/AT: m 1 2 3 Assembly Cost Ratio (Redesign only): KEAT/ATO: Normalized Assembly Time AT=ETn/100: 4 5 6 7 8 9 10 a 1 1.15 1.30 1.45 1.50 1.75 1.90 >10 0.85+ 0.15.m 2.05 2.20 2.35 Total Assembly Time = (seconds); Design Efficiency = (%) Assembly Cost Ratio = Top Screw (1) Block Top Screws (2) Lens (1) Blocks (2) Block Side Screws (2) All students answer all parts of Problem 2 2. Perform a Hitachi Assembly analysis of lens holder (upper part of the picture below). Fill Design summary table below. Indicate suggestions to improve the design and reanalyze using Hitachi method. 9 SEE LABELED LENS ASSEMBLY DRAING FOR DETAILS ORIGINAL DESIGN PRODUCT: Part Level 1234 PART NAME # OF PART S (n) OPERATION SYMBOLS # OF OPERA TIONS (m) e 100+ e T=(1 00+Ze) Ton LENS 1 1 0 100 100 100 TOP SCREW BLOCK BLOCK TOP SCREW BLOCK SIDE SCREW Assembly Efficiency Rating: N=Zn: Ton: Assembly Cost Ratio (Redesign only): K=AT/ATO: E=N(100)/AT: Normalized Assembly Time ATZT.n/100: 8 9 10 2.05 2.20 2.35 m 1 2 3 4 5 6 1 a 1.15 > 10 0.85 0.150m 1.30 1.45 1.50 1.75 1.90 Total Assembly Time = (seconds); Design Efficiency (%) IMPROVED DESIGN PRODUCT: Part Level 1234 PART NAME # OF PART S (n) OPERATION SYMBOLS # OF OPERA TIONS (m) e 100+ e T=ce(1 00+Ze) Ton N=Zn: Ton: Assembly Efficiency Rating: E=N(100)/AT: m 1 2 3 Assembly Cost Ratio (Redesign only): KEAT/ATO: Normalized Assembly Time AT=ETn/100: 4 5 6 7 8 9 10 a 1 1.15 1.30 1.45 1.50 1.75 1.90 >10 0.85+ 0.15.m 2.05 2.20 2.35 Total Assembly Time = (seconds); Design Efficiency = (%) Assembly Cost Ratio =

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Bank Performance, Risk And Firm Financing

Authors: P. Molyneux

1st Edition

0230313353, 9780230313354

More Books

Students also viewed these Accounting questions