Smithtown Manufacturing expected to produce 100,000 units with $300,000 of overhead, $500,000 of material, and $200,000 in labor. Actual production was 110,000 units with an overhead cost of $280,000, $550,000 in materials used; and $220,000 in labor.
If all the goods were completed how do I find out what amount would be transferred to finished goods?