Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Solve attached Testing is a crucial aspect of successful systems integration projects. Proper test plans and execution of the plans will ensure the project is

image text in transcribedimage text in transcribedimage text in transcribed

Solve attached

Testing is a crucial aspect of successful systems integration projects. Proper test plans and execution of the plans will ensure the project is ready for deployment and will operate with minimal problems. In this case assignment you will develop the test plan for your project. The test plan should be sufficient to ensure the quality of your project to a release level as discussed in the case assignment. You will also discuss the project evaluation and review for your project.

The submission for this assignment is a Microsoft PowerPoint presentation which should include the following:

A title slide with class number and name, project name, your name, and the date.

Slides with a description of the test plan for your project. The test plan should include at least three well-documented test cases and criteria for release-level quality of the project. The slides should address the key points and the notes section should provide the details.

A slide to summarize the test results for the project based on the test plan.

Slides to address the key points of the project evaluation and review process. Include a summary of your thoughts about the project, what can be improved in the processes used for requirements elicitation, design, implementation, and overall management of the project. The slides should address the key points and the notes section should provide the details. IMPORTANT: The summary slides must include voice recording.

The presentation should be 10 - 12 slides, not including the title slide and reference slide (if included).

The presentation will be assessed based on your ability to adequately creat and conduct a test plan and conduct a project review.

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed
Note: In cylindrical polar co-ordinates, the gradient operator is V = Or'r 80 and the cylinder stagnation points are located at (R.0) and (R, *). v) What is d'Alembert's paradox? "Y = Ur sin 0 Y,= (k sin 0)/(2xr) Figure 1: Streamfunctions and streamlines.Box and Whisker Plot 3 Use this Box and Whisker Plot to answer the following question. Average Monthly High Temperatures 26 Describe everything you can about the Average Monthly High 5 points Temperatures from the Box and Whisker Plot above. Your answer should have at least 5 facts. * Your answerIdentify a difference between central tendency error and leniency error. a. Central tendency error is a performance rating error, whereas leniency error is a selection error. Central tendency error occurs when assessors rate all workers as performing below expectations, whereas leniency error occurs when assessors rate all workers as performing above expectations. c. Central tendency error is also known as horns error, whereas leniency error is also known as halo CITOr. Central tendency error occurs when assessors rate all workers as average, whereas leniency error occurs when assessors rate all workers as performing particularly well.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Discrete Mathematics

Authors: Gary Chartrand, Ping Zhang

1st Edition

1478616261, 9781478616269

More Books

Students also viewed these Mathematics questions

Question

what does the command ! $ do in linux

Answered: 1 week ago

Question

Go, do not wait until I come

Answered: 1 week ago