Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Solve p6.32 ONLY!!! PROBLEMS Problem 6.31 Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles.

Solve p6.32 ONLY!!!
image text in transcribed
PROBLEMS Problem 6.31 Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa. Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 40,500 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, S1,215,000; direct labor, $222,600; and applied overhead, S150,000. a. b. c. Costs added to production during the month were direct materials, $2.565,000, direct labor $3,471,150. Overhead was assigned using the following information: Activity Rate nspection Maintenance Receiving S150 per inspection hour $750 per maintenance hour S300 per receiving order Actual Driver Usage 4,000 inspection hours 1,600 maintenance hours 2.000 receiving orders d. At the end of the month, 121,500 units were transferred out to Welding, leaving 13,500 units in ending work in process, or 25 percent complete. Required: 1. Prepare a physical flow schedule. 2. Calculate equivalent units of production for direct materials and conversion costs. 3. Compute unit cost under weighted average. 4. Calculate the cost of goods transferred to Welding at the end of the month. Calculate the cost of ending inventory. 5. Prepare the journal entry that transfers the goods from Cutting to Welding. Problem 6.32 FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Refer to the data in Problem 6.31. Assume that the FIFO method is used. Required: 1. Prepare a physical flow schedule. 2. Calculate equivalent units of production for direct materials and conversion costs. 3. Compute unit cost. Round to three decimal places. 4. Calculate the cost of goods transferred to Painting at the end of the month. Calculate the cost of ending inventory

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions