SOMEONE PLEASE HELP I NEED THEM ALL CORRECT. Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Eastern Polymers, Inc., processes a base chemical
SOMEONE PLEASE HELP I NEED THEM ALL CORRECT.
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Eastern Polymers, Inc., processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,200 units of product were as follows:
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Eastern Polymers, Inc., processes a base chemical into plastic. Standard costs and actual costs incurred for the manufacture of 5,200 units of product were as follows: Standard Costs Direct materials Direct labor Factory overhead Actual Costs 6,700 lbs. at $5.60 1,330 hrs. at $18.20 6,800 lbs. at $5.80 1,300 hrs. at $17.80 Rates per direct labor hr., based on 100% of normal capacity of 1,360 direct labor hrs.: Variable cost, $3.70 $4,760 variable cost Fixed cost, $5.80 $7,888 fixed cost Each unit requires 0.25 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total c variance as a negative number using a minus sign and an unfavorable variance as a positive numb Price variance Quantity variance Favorable * Favorable
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started