Southill Steel Ltd manufacture steel products for the local engineering market at their Limerick location. The values shown are from time studies of the operations
Southill Steel Ltd manufacture steel products for the local engineering market at their Limerick location. The values shown are from time studies of the operations at the various workstations.
(a) If the demand per shift is 450 units, calculate the staffing level required and the workload at each workstation and in total.
(b) If the demand per shift changes to 575 units, calculate the staffing level required and the workload at each workstation and in total.
(c) Comment on the implications of the change in demand.
Workstation Operation 1 SMV Operation 2 SMV Operation 3 SMV A 2.54 3.68 1.94 B 3.16 2.67 1.89 C 2.75 2.64 2.51 D 0.85 4.27 2.34 E 2.44 1.86 1.32
Step by Step Solution
★★★★★
3.41 Rating (167 Votes )
There are 3 Steps involved in it
Step: 1
To calculate the staffing level required and the workload at each workstation and in total we can use the Standard Minute Value SMV and the demand per shift SMV represents the time it takes to complet...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started