Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Southwestem University (SWU), a large state college in Stephenville. Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a

image text in transcribed
Southwestem University (SWU), a large state college in Stephenville. Texas, 30 miles southwest of the Dallas/Fort Worth metroplex, enrolls close to 20,000 students. In a typical town-gown relationship, the school is a dominant force in the small city, with more students during fall and spring than permanent residents. A longtime football powerhouse, SW is a member of the Big Eleven conference and is usually in the top 20 in college football rankings. To bolster its chances of reaching the elusive and long-desired number-one ranking. in 2012, SW hired the legendary Phil Flamm as its head coach One of Flamm's demands on joining SW had been a new stadium. With attendance increasing. SWU administrators began to face the issue head-on. After 8 months of study. much political arm wrestling, and some serious financial analysis, Dr. Joel Wisner, president of Southwestern University, had reached a decision to expand the capacity at its on-campus stadium. Adding thousands of seats, including dozens of luxury skyboxes, would not please everyone. The influential Flamm had argued the need for a first-class stadium, one with built-in dormitory rooms for his players and a palatial office appropriate for the coach of a future NCAA champion team. But the decision was made, and everyone, including the coach, would learn to live with it. The job now was to get construction going immediately after the 2010 season ended. This would allow exactly 270 days until the 2020 season opening game. The contractor, Jefferson Construction, signed his contract. Malick Jefferson looked at the tasks his engineers had outlined and looked President Wisner in the eye. "I guarantee the team will be able to take the field on schedule next year," he said with a sense of confidence. "I sure hope so." replied Wisner. "The contract penalty of $10.000 per day for running late is nothing compared to what Coach Flamm will do to you if our opening game with Penn State is delayed or canceled." Jefferson, sweating slightly, did not need to respond. In football-crazy Texas, Jefferson Construction would be mud if the 270-day target was missed. Back in his office, Jefferson again reviewed the date (see the following table) and noted that optimistic time estimates can be used as crash times. He then gathered his supervisors. "Folks, if we're not 75% sure we'll finish this stadium in less than 270 days, I want this project crashed! Give me the cost figures for a target date of 250 days-also for 240 days. I want to be early, not just on time!" Time Estimates (Days) Activity Description Predecessors Optimistic Most Likely Pessimistic Crash Cost/Day Bonding. insurance, tax structuring $1,500 Foundation, concrete footings for boxes 30 3.500 Upgrading skybox stadium seating 100 4.000 Upgrading walkways, stairwells, elevators 100 1,800 Interior wiring. lathes 35 3.500 Inspection approvals 0.1 0.1 0.1 LIIG- MOOFF Plumbing 35 2.500 H Painting 30 2,000 Hardware/AC/metal workings 60 2000 Tile/carpet/windows 3.000 Inspection 0.1 Final detail work/cleanup 1. K 4.500 Answer the following questions here and show your detailed work (solution) below for each part starting next page. If you worked on a spreadsheet, copy it under each part of your solution. Once finished, create a pdf file, and upload it on Blackboard. Part 1: What is the length of the critical path as computed from the table? [Your answer here] Part 2: What is the standard deviation of the critical path? Part 3: What is the probability of completing the project in 270 days? Part 4: What is the cost of crashing to 250 days

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Income Tax Fundamentals 2013

Authors: Gerald E. Whittenburg, Martha Altus Buller, Steven L Gill

31st Edition

1111972516, 978-1285586618, 1285586611, 978-1285613109, 978-1111972516

Students also viewed these General Management questions

Question

Draw a schematic diagram of I.C. engines and name the parts.

Answered: 1 week ago