Special order lamps are manufactured in division S. Because of the precise nature of the process a standard cost system has been developed. The following

Special order lamps are manufactured in division S. Because of the precise nature of the process a
standard cost system has been developed. The following standards are used for the special orders:
Standards
Lamp Kits$16.000000per lamp
Direct Labor2.400000per lamp (4 lamps/hr.)
Variable Overhead0.250000per lamp (4 lamps/hr.)
**Fixed Overhead10.000000per lamp
Total$28.650000
** Fixed overhead is based on expected production of 4,008 customized lamps each month.
To keep records of the actual cost of a job, a Job Order Cost System has been developed. Entries
are made to the Job Order System at actual cost (overhead is applied based on actual labor hours)
while entries are made to the accounting system at standard. Variance analysis is used to analyze the
differences.
Job Order Costing Section
On January 1, 20x2, Division S began Job 1101 for the Client, THE BIG CHILDREN STORE. The
job called for 4,000 customized lamps. The following set of transactions occurred from
January 5 until the job was completed:
5-JanPurchased 4,150 Lamp Kits @ $16.30 per kit.
9-Jan4,200 sets of Lamp Kits were requisitioned.
17-JanPayroll of 600 Direct Labor Hours @ $9.50 per hour.
30-JanPayroll of 650 Direct Labor Hours @ $9.75 per hour.
30-Jan3,992 lamps were completed and shipped. All materials requisitioned were
used or scrapped.
Month End Overhead Information
Actual Variable Overhead$1,275.00
Actual Fixed Overhead

$40,373.45

--

How many lamps were completed?

What was the total material price variance for the Lamp kits purchased?

What was the material usage variance for Lamp Kits?

What was the direct labor efficiency variance?

What was the direct labor rate variance?

What was the variable overhead efficiency variance?

What was the variable overhead spending variance?

What is the fixed overhead volume (denominator) variance?

What was the fixed overhead spending variance?

Step by Step Solution

3.38 Rating (160 Votes )

There are 3 Steps involved in it

Step: 1

How many lamps were completed ANS WER 3 992 lamps were completed and shipped D ETA IL ED WORK ING The following calculations are done to determine the total cost of the Job 11 01 P urch ased 4 150 Lam... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting for Decision Making and Control

Authors: Jerold Zimmerman

8th edition

78025745, 978-0078025747

More Books

Students also viewed these Accounting questions