Question
(Spreadsheet Problem) You run a manufacturing facility. Last year your facility manufactured 21 products with the following characteristics: Products Number of Parts in the Product
(Spreadsheet Problem)
You run a manufacturing facility. Last year your facility manufactured 21 products with the following characteristics:
Products | Number of Parts in the Product | Quantity Manufactured | Fabrication Time (hours/part) | Design and Prototyping (Eng. hours) |
1 | 13 | 100 | 120 | 14 |
2 | 10 | 234 | 98 | 8 |
3 | 34 | 1000 | 389 | 57 |
4 | 56 | 2000 | 600 | 110 |
5 | 112 | 9 | 1000 | 350 |
6 | 34 | 50 | 340 | 32 |
7 | 78 | 100 | 800 | 200 |
8 | 22 | 100 | 200 | 22 |
9 | 43 | 250 | 415 | 78 |
10 | 89 | 1000 | 900 | 300 |
11 | 6 | 50 | 60 | 4 |
Activity-Based Costing (ABC)
Products | Number of Parts in the Product | Quantity Manufactured | Fabrication Time (hours/part) | Design and Prototyping (Eng. hours) |
12 | 113 | 50 | 1150 | 400 |
13 | 212 | 50 | 2000 | 1000 |
14 | 19 | 1000 | 200 | 17 |
15 | 28 | 1245 | 300 | 30 |
16 | 111 | 20 | 1116 | 356 |
17 | 44 | 250 | 450 | 70 |
18 | 100 | 69 | 1000 | 347 |
19 | 55 | 345 | 567 | 86 |
20 | 34 | 25 | 335 | 40 |
21 | 12 | 500 | 123 | 12 |
In addition, the following data is known about last year:
- 1.1 million labor hours were used to build the 21 products (note, labor hours and fabrication hours are not the same)
- $37/hour labor rate
- Assume there is no inflation
Activity | Cost ($) | Cost Driver | Driver Quantity Data |
Design and Prototype | $290,000 | Engineering Hours | |
Programming, Setup and Tooling | $150,000 | Number of Setups | 21 |
Fabrication | $70,000,000 | Fabrication Hours | |
Receiving | $150,000 | Number of Receipts | 312 |
Packing and Shipping | $150,090 | Number of Customers | 43 |
You are considering manufacturing the following 3 new products:
Product A | Product B | Product C | |
Number of Parts in the Product | 23 | 46 | 212 |
Number of Setups | 1 | 1 | 1 |
Number of Receipts | 12 | 3 | 32 |
Number of Customers | 3 | 1 | 7 |
Quantity Required | 25 | 154 | 1000 |
Use ABC to determine how much you should quote customers for each of the products (assume no profit in the quotes). Your answer should be based on last years history (do not assume that products A, B, and C have or are necessarily going to be built)
Hints:
1)You will need to figure out the number of engineering hours and fabrication hours needed for the three new products
2)You can figure out the labor hours associated with each new product from last years ratio of labor hours to fabrication hours.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started