Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

sqa 5. Consider two different machines A and B that could be used al CHR a mean effective process time t, of 1.0 hours

image

sqa 5. Consider two different machines A and B that could be used al CHR a mean effective process time t, of 1.0 hours and an SCV c2 of 0.25. Machine B has a mean effective process time of 0.85 hour and an SCV of four. (Hint: You may find a simple spreadsheet helpful in making the calculations required to answer the following questions.) a. For an arrival rate of 0.92 job per hour with c = 1, which machine will have a shorter average cycle time? - b. Now put two machines of type A at the station and double the arrival rate (i.e., double the capacity and the throughput). What happens to cycle time? Do the same for machine B. Which type of machine produces shorter average cycle time? c. With only one machine at each station, let the arrival rate be 0.95 job per a hour with c2= 1. Recompute the average time spent at the stations using both machines A and B. Compare with a. d. Consider the station with one machine of type A. i. Let the arrival rate be one-half. What is the average time spent at the station? What happens to the average time spent at the station if the arrival rate is increased by one percent (i.e., to 0.505)? What percentage increase in wait time does this represent? ii. Let the arrival rate be 0.95. What is the average time spent at the station? What happens to the average time spent at the station if the arrival rate is increased by one percent (i.e., to 0.9595)? What percentage increase in wait time does this Ve represent?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Managerial Approach

Authors: Jack R. Meredith, Samuel J. Mantel,

7th Edition

470226218, 978-0470226216

More Books

Students also viewed these General Management questions

Question

What factors contribute most to the comprehension of read text?

Answered: 1 week ago