Stanford Enterprises has provided its manufacturing estimated and actual data for the year end The Controller has asked you to compute the predetermined overhead rate the schedule of cost of goods manufactured, and the schedule of cost of goods sold. Use the information included in the Excel Simulation and the Excel functions descubed below to complete the task . Cell Reference: Allows you to refer to data from another cell in the worksheet From the Excel Simulation below, if in a blank cell, "=E5% was entered the formula would output the result from cell E5, or $275,000 in this example Basic Math functions: Allows you to use the basic math symbols to perform mathematical functions. You can use the following keys (plus agn to add) - (minus sign to cubtract): (asterisk sign to multiply) and forward slash to divide) From the Excel Simulation below. If in a blank cell E6-7 was entered the formula would add the values from those cells and output the result or 52,760 in this example. If using the other math symbols the result would output an appropriate answer for its function SUM function Allows you to refer to multiple cells and adds all the values. You can add individual cell references or ranges to utilize this function From the Excel Simulation below, if in a blank cell"SUM(E 10 E 11E 12" was entered the formula would output the result of adding those three separate cells, or 1214,050 in this example Similarly, if in a blank cell "SUME 10:E127 was entered the formula would output the same result of adding those cells, except they are expressed as a range in the formula, and the result would be 1214,050 in this example Excel HW i boro ront byes > HI G D E H c 1 Stanford Enterprises uses job-order costing, 2 The allocation base for overhead is direct labor hours. 3 $ 275,000 25,000 27,760 4 Data for the year just ended: 5 Estimated total manufacturing overhead cost 6 Estimated total direct labor hours 7 Actual total direct labor hours 9 Actual costs for the year Purchase of raw materials (all direct) 11 Direct labor cost 22 Manufacturing overhead costs 8 10 $375,000 $536,300 $302,750 13 14 Inventories: 15 Raw materials (all direct) 16 Work in process 17 Finished goods Beginning $ 15,000 $ 27,875 $ 34,600 Ending $ 11,375 $ 22,350 $ 26,450 18 19 Use the data to answer the following 20 Prev 1 of Next 23 19 Use the data to answer the following. 20 21 1. Compute applied overhead and determine the amount of underapplied or overapplied overhead: 22 Actual manufacturing overhead cost Predetermined overhead rate 24 Actual direct labor hours 25 Manufacturing overhead applied 26 27 Underapplied (overapplied) manufacturing overhead 28 29 2. Prepare a schedule of cost of goods manufactured: 30 31 Stanford Enterprises 32 Schedule of Cost of Goods Manufactured 33 Direct materials: 34 Raw materials inventory, beginning 35 Add: Purchases of raw materials 36 Total raw materials available 37 Deduct: Raw materials inventory, ending 38 Raw materials used in production 39 Direct labor 40 Manufacturing overhead applied to work in process 41 Total manufacturing costs AJ. Saved Excel HW 0 40 Manufacturing overhead applied to work in process 41 Total manufacturing costs 42 Add: Beginning work in process inventory 43 44 Deduct: Ending work in process inventory 45 Cost of goods manufactured 46 47 3. Prepare a schedule of cost of goods sold. 48 49 Stanford Enterprises 50 Schedule of Cost of Goods Sold 51 52 Finished goods inventory, beginning 53 Add: Cost of goods manufactured 54 Cost of goods available for sale 55 Deduct: Finished goods inventory, ending 56 Unadjusted cost of goods sold 57 Underapplied (overapplied) overhead 58 Adjusted cost of goods sold 59 60