Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

State Name City Name Campus Name Address 1 Building Code Building Name Date Built Building Number Gross Square Footage ft? Net Square Footage ft? Net

image text in transcribedimage text in transcribed

State Name City Name Campus Name Address 1 Building Code Building Name Date Built Building Number Gross Square Footage ft? Net Square Footage ft? Net Assignable Square Footage Ohio Cincinnati Uptown Campus West 301 Clifton Court CROSLEY Crosley Tower 7/1/1969 7180 163,638.78 140 580.45 80,741.36 Floor Code 01 02 03 04 05 06 07 08 09 10 Building Code CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY Gross Square Footage ft? 29,126.56 8,700.00 8,712.00 8,774.00 8,774.00 8,743.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 1,322.00 1,087.22 Total Room Area ft? 26,698.37 7,531.00 7,458.93 7,520.65 7,546.29 7,500.81 7,488.49 7,472.69 7,483.25 7,334.31 7,346.68 7,336.21 7,440.90 7,448.68 7,450.97 7,535.61 1,090.61 996.00 Assignable Area 9,454.16 3,705.76 4,930.07 4,859.52 4,571.89 4,695.60 4,997.02 4,944.66 5,018.97 4,398.64 4,412.23 4,491.49 5,098.08 5,087.56 4,864.98 5,210.73 0.00 0.00 11 12 13 14 15 16 17 18 Crosley Tower was constructed in 1969 and was named after UC alumnus Power Crosley, Jr., owner of the Crosley Radio Company. The building was built using slip-form construction, an approach where concrete is continuously poured into a form which is raised as the building is raised. As a result, Crosley Tower holds the record for the second-largest single pour of concrete in the world, trailing only the Hoover Dam. However, the building is beginning to shows signs of its age with a crumbling exterior and an unadaptable interior layout. As a result, the university intends to demolish Crosley Tower by 2025 to make room for a new building that better meets the needs of the students, faculty, and staff of UC. After a long, painstaking search, UC has selected YOU as the student representative to the committee developing plans for the demolition. As it might not be wise to trust students with explosives, you have been assigned to the subcommittee developing the plans for the removal ENED 1100 - HW 7.1-Fall 2021 of the rubble once the tower is brought down. You are currently exploring how much it will cost to remove the rubble consisting of the concrete exterior of the building. However, in order to get a quote, you first need to know how much concrete will need to be moved. Utilizing all steps of the Problem Presentation Method, estimate the weight of concrete rubble that will need to be removed so that you can reach out to companies for bids on the project. State Name City Name Campus Name Address 1 Building Code Building Name Date Built Building Number Gross Square Footage ft? Net Square Footage ft? Net Assignable Square Footage Ohio Cincinnati Uptown Campus West 301 Clifton Court CROSLEY Crosley Tower 7/1/1969 7180 163,638.78 140 580.45 80,741.36 Floor Code 01 02 03 04 05 06 07 08 09 10 Building Code CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY CROSLEY Gross Square Footage ft? 29,126.56 8,700.00 8,712.00 8,774.00 8,774.00 8,743.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 8,840.00 1,322.00 1,087.22 Total Room Area ft? 26,698.37 7,531.00 7,458.93 7,520.65 7,546.29 7,500.81 7,488.49 7,472.69 7,483.25 7,334.31 7,346.68 7,336.21 7,440.90 7,448.68 7,450.97 7,535.61 1,090.61 996.00 Assignable Area 9,454.16 3,705.76 4,930.07 4,859.52 4,571.89 4,695.60 4,997.02 4,944.66 5,018.97 4,398.64 4,412.23 4,491.49 5,098.08 5,087.56 4,864.98 5,210.73 0.00 0.00 11 12 13 14 15 16 17 18 Crosley Tower was constructed in 1969 and was named after UC alumnus Power Crosley, Jr., owner of the Crosley Radio Company. The building was built using slip-form construction, an approach where concrete is continuously poured into a form which is raised as the building is raised. As a result, Crosley Tower holds the record for the second-largest single pour of concrete in the world, trailing only the Hoover Dam. However, the building is beginning to shows signs of its age with a crumbling exterior and an unadaptable interior layout. As a result, the university intends to demolish Crosley Tower by 2025 to make room for a new building that better meets the needs of the students, faculty, and staff of UC. After a long, painstaking search, UC has selected YOU as the student representative to the committee developing plans for the demolition. As it might not be wise to trust students with explosives, you have been assigned to the subcommittee developing the plans for the removal ENED 1100 - HW 7.1-Fall 2021 of the rubble once the tower is brought down. You are currently exploring how much it will cost to remove the rubble consisting of the concrete exterior of the building. However, in order to get a quote, you first need to know how much concrete will need to be moved. Utilizing all steps of the Problem Presentation Method, estimate the weight of concrete rubble that will need to be removed so that you can reach out to companies for bids on the project

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Public Sector Accounting And Budgeting For Non-Specialists

Authors: G. Jan Van Helden, Ron Hodges

1st Edition

1137376988, 9781137376985

More Books

Students also viewed these Accounting questions