Steve's Plastics Manufacturing allocates overhead cost based on machine hours. Estimated manufacturing overhead (overhead) costs $100,000 Estimated machine hours 20,000 The predetermined overhead cost rate
Steve's Plastics Manufacturing allocates overhead cost based on machine hours.
Estimated manufacturing overhead (overhead) costs | $100,000 |
Estimated machine hours | 20,000 |
The predetermined overhead cost rate is:
Group of answer choices
$4.80 per machine hour.
$6.00 per machine hour.
$4.00 per machine hour.
$5.00 per machine hour.