Summit Manufacturing Company manufactures two products 24,000 units of Product #1 and 10,000 units of Product #2. The company uses a plantwide overhead rate based on direct labour-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products #1 and #2. Activity Measure Estimated Overhead Cost Expected Activity Machining Machine-hours $ 350,000 15,000 MH Machine setups Number of setups $ 225,000 400 setups Product design Number of products $ 16,000 2 products General factory Direct labour-hours $ 400,000 11,000 DLHs Product 1 Product 2 Machine-hours 5,000 2,000 Number of setups 55 175 Number of products 1 1 Direct labour-hours 7,500 3,500 Required: What is the companys plantwide-overhead rate? Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product 1? How much is allocated to Product 2? What is the activity rate for the Machining activity cost pool? What is the activity rate for the Machine Setups activity cost pool? What is the activity rate for the Product Design activity cost pool? What is the activity rate for the General Factory activity cost pool? Using the ABC system, how much total manufacturing overhead cost would be assigned to Product 1? Using the ABC system, how much total manufacturing overhead cost would be assigned to Product 2?
Summit Manufacturing Company manufactures two products 24,000 units of Product #1 and 10,000 units of Product #2. The company uses a plantwide overhead rate based on direct labour-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products #1 and #2.
Activity Measure
Estimated Overhead Cost
Expected Activity
Machining
Machine-hours
$ 350,000
15,000 MH
Machine setups
Number of setups
$ 225,000
400 setups
Product design
Number of products
$ 16,000
2 products
General factory
Direct labour-hours
$ 400,000
11,000 DLHs
Product 1
Product 2
Machine-hours
5,000
2,000
Number of setups
55
175
Number of products
1
1
Direct labour-hours
7,500
3,500
Required:
What is the companys plantwide-overhead rate?
Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product 1? How much is allocated to Product 2?
What is the activity rate for the Machining activity cost pool?
What is the activity rate for the Machine Setups activity cost pool?
What is the activity rate for the Product Design activity cost pool?
What is the activity rate for the General Factory activity cost pool?
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product 1?
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product 2?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started