sumptions. Use the information 1. A cost engineer estimated the total equipment bare module cost of a plant in $100,000,000. In the report the engineer
sumptions. Use the information 1. A cost engineer estimated the total equipment bare module cost of a plant in $100,000,000. In the report the engineer forgot to include a floating shell and tube heat exchanger of stainless steel. The heat exchanger has an area of 100m and operates at 100 barg pressure in each side. Estimate the total grass root cost in Wi/2021 (CEPCI=730) for the project including this heat exchanger. (30 pts)